Prescott makes handheld calculators in two models basic and professional Prescott estimated 5721.000 of manufacturing overhead...
Prescott makes handheld calculators in two models-basic and professional. Prescott estimated $937,500 of manufacturing overhead and 625,000 machine hours for the year. The basic model actually consumed 240,000 machine hours, and the professional model consumed 385,000 machine hours. The predetermined overhead allocation rate using machine hours as the allocation base is $1.50 per machine hour, with the allocated overhead costs split between the basic model and the professional model by $360,000 and $577,500, respectively. (Click the icon to view the...
koehler makes handheld calculators in two model: basic and professional.koehler estimated $721,000 of manufacturing overhead and 515,000 machine hours for the year. the basic model actually consumed 230,000 machine hours, and the professional model consumed 285,000 machine hours. requirements are: 1. compute the predetermined overhead allocation rate using machine hours as the allocation base. 2. how much overhead is allocated to the basic model? to the professional model? select the formula, then enter the amounts to compute the predetermined overhead...
Fletcher, Inc. uses activity-based costing to account for its chrome bumper manufacturing process. Company managers have identified four manufacturing activities: materials handling, machine setup, insertion of parts, and finishing. The budgeted activity costs for 2018 and their allocation bases are asfollows: Activity Total Budgeted Cost Allocation Base Materials handling $3,000 Number of parts Machine setup 3,000 Number of setups Insertion of parts 52,000 Number of parts Finishing 72,000 Finishing direct labor hours Total $130,000 Fletcher expects to produce 500 chrome...
Comprehensive In Class ABC Problem A manufacturer makes two types of snowmobiles. Basic and Deluxe, and reports the following data to be used in applying activity-based costing. The company budgets production of 6,000 Basic snowmobiles and 2,000 Deluxe snowmobiles. Activity Pool Activity Cost Driver Cost assigned Basic Deluxe Machine setup Number of setups $150,000 200 batches 300 batches Materials handling Number of parts $250,000 10 per unit 20 per unit Machine depreciation Machine Hours $720,000 1 MH per unit 1.5 MH...
expected data starts with parts per rim standard | deluxe
Elton Company manufactures wheel rims. The controller expects the following The company expects to produce 500 units of each model during the year. ABC allocation rates for 2018: (Click the icon to view the allocation rates.) Read the requirements. Elton produces two wheel rim models: standard and deluxe. Expected data for 2018 are as follows: (Click the icon to view the expected data.) Requirement 1. Compute the total estimated indirect...
Compute the predetermined overhead allocation rate for each activity 2 Points Volty, Inc. uses activity-based costing to account for its chrome bumper manufacturing process. Company managers have identified four manufacturing activities: materials handling, machine setup, insertion of parts, and finishing. The budgeted activity costs for 2018 and their allocation bases are as follows: Activity Materials handling Machine setup Insertion of parts Finishing Total Total Budgeted Cost $15,000 6,000 60,000 90,000 $171,000 Allocation Base Number of parts Number of setups Number...
Question Help Fredenck Company usos ABC to account for its chrome wheel manufacturing rous Com m unaners have identified four manufacturing activities that incur manufacturing overhead costs: materials handling, machine setup insertion of parts and finishing the budgeted activity costs for the upcoming year and the allocation bases are as follows: (Click the icon to view the budgeted costs and activity bases) Frederick Company expects to produce 1,000 chrome wheels during the year. The wheels are expected to use 2,750...
For the LODDE N Data Table i Data Table 20.0 Activity Cost Activity Allocation Base Allocation Rate Materials handling .... Number of parts $ 5,50 per part Machine setup Number of setups $ 325.00 per setup Insertion of parts ..... Number of parts $ 27.00 per part Finishing ............ Finishing direct labor hours $ 52.00 per hour Standard Deluxe Parts per wheel ........ 10.0 Setups per 1,000 wheels ........... 20.0 Finishing direct labor hours per wheel..... Total direct labor hours...
Several years after reengineering its production process,
Biltmore Corporation hired a new controller, Tammy English. For
the upcoming year, Biltmore's budgeted ABC manufacturing overhead
allocation rates are as follows:
The number of parts is now a feasible allocation base because
Biltmore recently installed a plantwide computer system. Biltmore
produces two wheel models: Standard and Deluxe. Budgeted data for
the upcoming year are as follows:
Requirement 1. Compute the total budgeted manufacturing overhead
cost for the upcoming year.
Requirement 2....
Central Pain uses ABC to account for its chrome wheel manufacturing process. Company managers have identified four manufacturing activities that incur manufacturing overhead costs: materials handling, machine setup, insertion of parts, and finishing. The budgeted activity costs for the upcoming year and their allocation bases are as follows: m (Click the icon to view the budgeted costs and activity bases.) Central Plain expects to produce 1000 chrome wheels during the year. The wheels are expected to use 3,000 parts, require...