Working:-
a. Direct materials used = $152,250 - $44,800 - $56,000 = $51,450
b. Work in process 1/1/20 = $210,800 - $152,250 = $58,550
c. Work in process 12/31/20 = $210,800 - $193,600 = $17,200
d. Manufacturing Overhead applied = $44,800/$56,000*$147,500 = $118,000
e. Total manufacturing overhead = $86,600+$147,500+$118,000 = $352,100
f. Total cost of work in process = $352,100 + $24,800 = $376,900
g. Cost of goods manufactured = $376,900 - $13,600 = $363,300
h. Direct labor = ($214,000 - $64,150)/180% =$83,250
i. Manufacturing Overhead applied = $214,000 - $64,150 - $83,250 = $66,600
j. Total cost of work in process = $214,000 + $18,400 = $232,400
k. Work in process 12/31/20 = $232,400 - $223,400 = $9,000
If you still have any query feel free to ask in comment section. Thanks
Manufacturing cost data for Waterway Company, which uses a job order cost system, are presented below....
Manufacturing cost data for Orlando Company, which uses a job
order cost system, are presented below.
Indicate the missing amount for each letter. Assume that in all
cases manufacturing overhead is applied on the basis of direct
labor cost and the rate is the same. (Round overhead
rate to 2 decimal places, e.g. 15.25 and final answers to 0 decimal
places, e.g. 5,275.)
Case A
Case B
Case C
Direct materials used
$
(a)
$86,200
$68,150
Direct labor
52,000
144,800...
Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.25 and final answers to decimal places, e.. 5,275.) Case A Case B Direct materials used 49350 $93,400 Direct labor 56,000 146,100 70077.94 Manufacturing overhead applied 44,800...
Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.25 and final answers to 0 decimal places, e.g. 5,275.) Case A Case B Case C $89,300 $73,050 (a) Direct materials used 63850 149,800 (h) Direct labor...
Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, eg. 15.25 and final answers to O decimal places, e.g. 5,275.) Case A Case B Case C Direct materials used Direct labor Manufacturing overhead 55450 (a) $ 91,800...
Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.25 and final answers to 0 decimal places, e.g. 5,275.) Case A Case B Case C Direct materials used $enter a dollar amount (a) $91,700 $69,550 Direct...
Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.25 and final answers to O decimal places, e.g. 5,275.) Case A Case B Direct materials used $93,600 Direct labor 54,000 146,500 Manufacturing overhead applied 32,400 Total...
Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.25 and final answers to O decimal places, e.g. 5,275.) Case A Case B Direct materials used $ 69150 (a) $84,200 Direct labor 50,000 145,200 Manufacturing overhead...
Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.25 and final answers to 0 decimal places, e.g. 5,275.) Case A Case B Direct materials used $84,200 Direct labor 50,000 145,200 Manufacturing overhead applied 30,000 Total...
Manufacturing cost data for Vaughn Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.25 and final answers to O decimal places, e.g. 5,275.) Case A Case B Case C Direct materials used $92,100 $63,150 Direct labor 54,000 149,000 3 Manufacturing...
Manufacturing cost data for Vaughn Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.25 and final answers to O decimal places, e.g. 5,275.) Case A Case B Case C Direct materials used $ (a) $92,100 $63.150 Direct labor 54.000 149,000...