Question

Which of the following is not a cost resulting from a unit-level activity? a) The cost...

Which of the following is not a cost resulting from a unit-level activity?

a) The cost of electricity to power manufacturing equipment.

b) The indirect cost of glue used on each product.

c) The cost of sending monthly statements to customers.

d) The per unit cost of packaging goods.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Option A

Unit level activities are those activities which occur with the production of a single unit. Cost of electricity to power manufacturing equipment is a batch level activity.

Comment if you face any issues

Add a comment
Know the answer?
Add Answer to:
Which of the following is not a cost resulting from a unit-level activity? a) The cost...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question 39 3 pts 39. Which of the following is not a cost resulting from a...

    Question 39 3 pts 39. Which of the following is not a cost resulting from a unit-level activity? The cost of sending monthly statements to customers. The per unit cost of packaging goods. The cost of electricity to power manufacturing equipment, The indirect cost of glue used on each product.

  • 12.   Which of the following activity costs would likely be included in a batch-level activity cost...

    12.   Which of the following activity costs would likely be included in a batch-level activity cost pool? A.    Per unit inspection costs B.    Machine set-up costs C.    Quality control costs D.    All of these answers are correct. 13.   A product-level activity center would likely include all of the following costs except: A.    engineering development costs. B.    legal fees to obtain and protect patents. C.    packaging design costs. D.    materials handling costs.

  • Question 9 Match the following statements to the appropriate terms. Allocates overhead to multiple activity cost...

    Question 9 Match the following statements to the appropriate terms. Allocates overhead to multiple activity cost pools, then assigns the activity cost pools to products. An activity that has a direct cause-effect relationship with the resources consumed. Increases the worth of a product or service to customers. Should be eliminated or reduced. Plant management. Engineering changes. Equipment setups. Assembling. Primary objective is to eliminate all manufacturing inventories. Used to initiate manufacturing under JIT processing. Activity-based costing Product-level activity Unit-level activity...

  • 1. Find the Activity Rate. 2. Find the Assigning Overhead Cost. The following data are for...

    1. Find the Activity Rate. 2. Find the Assigning Overhead Cost. The following data are for the two products produced by Tadros Company. Product A Product B Direct materials $15 per unit $24 per unit Direct labor hours 0.3 DLH per unit 1.6 DLH per unit Machine hours 0.1 MH per unit 1.2 MH per unit Batches 125 batches 225 batches Volume 10,000 units 2,000 units Engineering modifications 12 modifications 58 modifications Number of customers 500 customers 400 customers Market...

  • The following annual per unit cost data at an activity level of 10,000 units has been...

    The following annual per unit cost data at an activity level of 10,000 units has been provided below. The company produces and sells only one product.: $ Per Unit Sales 150.00 Direct labor Direct material 15.00 18.00 7.50 Variable manufacturing overhead Fixed manufacturing overhead Variable selling expenses Fixed selling expenses Fixed administrative expenses 50.00 1.50 40.00 ... 15.00 The relevant range is 8,000 - 13,000 units. You must enter your answer in the following format: $x.xxx At the current level...

  • Product B Product A Direct materials $14 per unit 0.5 DLH per unit 0.4 MH per...

    Product B Product A Direct materials $14 per unit 0.5 DLH per unit 0.4 MH per unit $25 per unit 1.5 DLH per unit 1.1 MH per unit Direct labor hours Machine hours Batches 125 batches 250 batches 10,000 units 10 modifications 2,000 units Volume Engineering modifications Number of customers 50 modifications 500 customers 400 customers 95 per unit per 'unit Market price $35 per unit The company's direct labor rate is $20 per direct labor hour (DLH). Additional information...

  • 11) A variable cost is a cost that a. varies per unit at every level of...

    11) A variable cost is a cost that a. varies per unit at every level of activity. b. occurs at various times during the year. c. varies in total in proportion to changes in the level of activity. d. may or may not be incurred, depending on management's discretion. 12) A cost which remains constant per unit at various levels of activity is a a. variable cost. b. fixed cost. c. mixed cost. d. manufacturing cost. 13) Fixed costs normally...

  • unit-level, batch-level, product-level, or facility-level.

    Otto Dieffenbach & Sons Inc. is a small manufacturing company that uses activity-based costing. Dieffenbach & Sons accumulates overhead in the following activity cost pools.For each activity cost pool, indicate whether the activity cost pool would be unit-level, batch-level, product-level, or facility-level.1.Hiring personnel                                                           Product-level activityFacility-level activityBatch-level activityBatch-level or unit-level activityUnit-level activity2.Managing parts inventory                             ...

  • The following table shows the manufacturing cost of each unit is calculated, using activity-based costing, for...

    The following table shows the manufacturing cost of each unit is calculated, using activity-based costing, for these manufacturing cost pools. Cost Pools Materials handling Manufacturing supervision Assembly Machine setup Inspection and testing Packaging Allocation Base Number of parts Hours of machine time Number of parts Each setup Logged hours Logged hours Costing Rate $ 3.00 per part $22.80 per hour $ 4.95 per part $46.60 per setup $35.00 per hour $25.00 per hour BSI currently sells the A-10 model for...

  • Activity Level Activity Cost-Driver Base Cost Product A Product B Production setup Number of setups 90,000...

    Activity Level Activity Cost-Driver Base Cost Product A Product B Production setup Number of setups 90,000 11 19 Materials handing & requisition Number of parts per unit 15,000 6 18 Packaging & shipping Number of units shipped 45,000 60,000 120,000 Total overhead 150,000 Paris, Inc, Produces two products, Product A and Product B. If currently allocates overhead costs using direct-labor hours, but the controller has recommended an activity-based costing (ABC) system using the following data: B. Compute the amount of...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT