Draw a Product Structure Diagram from the bill of material for a Xavier Skateboard as shown below.Assuming a 10% profit Margin, how should the Xavier be priced? Show your costs per item and total cost
can someone help me to solved this problems ? the instruction is formulate mathematical model with using excel solver.objective functionconstrainsQuestionThe Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production...
Gordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are: A B C D 4 8 7 A B С D D 7 7 9 Workpieces moved per week between work areas are: A B 1,000 с 800 500 A B C D D 650 300 600 bls It costs Gordon $3 to move 1 work piece 1 foot. The weekly total material handling cost of the layout...
The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the following table. Because of the high physical demands of the job, the company's policy is a 25% allowance for workers.
Prepare a master schedule given this information: The forecast for each week of an eight-week schedule is 60 units. The MPS rule is to schedule production if the projected on-hand inventory would be negative without it. Customer orders (committed) are as follows:
In the molding shop, there are 11 machines capable of molding the one part done in-house, but historically one machine is always being maintained or repaired at any given time. Each machine requires a full-time operator who earns an hourly wage of $15, though only 50 minutes of a molding operator's typical hour is occupied with the tasks of loading, unloading, actively monitoring, and adjusting the machine. The machines can each produce 25 parts per hour. The workers will work...
A barbecue sauce producer sells their product in a 20-ounce bottle. Their current process mean is 19.9 ounces with a standard deviation of 0.33 ounces. If their tolerance limits are set at 20 ounces plus or minus 1 ounce, what is the process capability index/ratio of the bottle filling process?
https://docs.google.com/spreadsheets/d/1SECKrulqb-ayssJvuexKapr4M2z9lh9o/edit?usp=sharing&ouid=102283351197431649410&rtpof=true&sd=true https://docs.google.com/spreadsheets/d/1a8tfnKvbG-wfWBk9vXpg0cm1WRpcwWaT/edit?usp=sharing&ouid=102283351197431649410&rtpof=true&sd=true please also use the related google doc files
Art and Sandy Binley make apple crates for resale to local growers. They and their three employees invest 50 hours per day making 150 creates. a) What is their productivity? b) They have discussed reassigning work so the flow through the shop is smoother. If they are correct and can do the necessary training, they think they can increase crate production to 155 per day. What would be their new productivity? c) What would be their increase in productivity?