Does a 60” RCP culvert work for the 25 year flow rate design controls and prevent...

Does a 60” RCP culvert work for the 25 year flow rate design controls and prevent flooding of the critical structure given the following conditions: 200’ long culvert @0.30%. Invert elevation at tail end of pipe = 10.00. ODOT ½ headwall. Pavement elevation = 17.95. Critical Structure FFE = 18.65.

Q25 = 140 cfs, Q50 = 172 cfs, TW25 = 2.5’ TW50 = 2.9’

0 0
Add a comment Improve this question Transcribed image text
Answer #1

ANSWERReinforced concrete pipe Current Besign! A) 1) Eischarge : 295 = 140CFS 050 = 1490FS. Area of culvert = I xor A = 4602 A = 28@ L200 Om 60 pu! ! Discharge CFS 100 Hw depth. (ilo) Length Culvest = 2009 slope 0.9 100 -0.003 chart head for concrete pipeH-value=5 hos Tw or ((critical depth 0)) 200 50K-6-0-25 60 100+ V100 DETO) Head (4) ho=2.5 ho = (3.5+4) from cortical depth -4 (a) using inlet Control homograph. Holo 1.3 Hw=1-35% bom HwE 6.75 Ft (11) H-value = 4.5 Hwe 4.5+4.95- (900X0-003) HW-3.15 (

Add a comment
Know the answer?
Add Answer to:
Does a 60” RCP culvert work for the 25 year flow rate design controls and prevent...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT