Problem Two - Using the information in data set one, which I have included in the table below, recalculate total cost, fixed cost, variable cost, marginal cost, average total cost, average variable cost and average fixed costs if the price of the variable input (which is labor in this example) is not $50 but $55. I have created Table 2 for you to put your answers in. Assume that fixed costs remain at $230. When the price of a variable input changes which other costs will increase? Compare the costs you calculate for table two to the costs calculated in table one to find your answers.
TABLE TWO FOR ANSWERS TO PROBLEM TWO
Units of Labor |
Total Product (output) |
FC |
VC |
TC |
MC |
ATC |
AVC |
AFC |
0 |
0 |
|||||||
1 |
3 |
|||||||
2 |
7 |
|||||||
3 |
12 |
|||||||
4 |
16 |
|||||||
5 |
19 |
|||||||
6 |
21 |
Problem Two - Using the information in data set one, which I have included in the...
PROBLEM ONE - Using the information in data set one, which I have included in the table below, recalculate total cost, fixed cost, variable cost, marginal cost, average total cost, average variable cost and average fixed costs if the price of the fixed input (the small stores rent) is not $200 but $220. A new lease may have caused the rent to increase. I have created Table 1 for you to put your answers in. Assume the price of the...
Find FC, VC, TC, AFC, AVC, ATC, and MC from the following table. Capital costs $50 per unit, and two units of capital are used in the short run. Labor costs $20 per unit. 7. Total Cost Average Average Marginal Variable Cost |(MC) Fixed Units of Units of Variable Average Fixed Labor (L) Cost (FC) Cost (VC) (TC) Total Cost Output (ATC) (Q) Cost Cost (AFC) (AVC) 0 0 1 2 2 4 3 6 4 8 10
Finish the table. MPL: Marginal production of labor TC: Total cost MC: Marginal Cost AFC: Average fixed cost AVC: Average variable cost ATC: Average total cost lormal text - Times New... - 12 B I VA G E A E 1 E- Labor Week 6 Assignment: Production Costs 20 Points) Output MPL FC VC TC MC AFC AVC ATC (Q) 0 25 WN 25 50 75 100 13 25 15 F 16 25 125 1. Complete the table above. (4...
The total costs for Morris Industries are summarized in the following table. Based on this information, fill in the missing entries in the table for fixed cost, variable cost, average fixed cost, average variable cost, average total cost, and marginal cost. (1) (2) (3) (4) (5) (6) (7) (8) Q FC VC TC AFC AVC ATC MC 0 1,000 10 2,000 20 2,500 30 4,000 40 6,000 50 10,000 60 15,000
Consider a day for a local junk removal company. The inputs the company uses to haul junk are two employees each paid an hourly wage of $15 per hour and a moving truck, which costs $100 (splitting the cost of ownership over periods). Each hauling job takes 1 hour. Are labor hours a fixed or variable input? Explain. Is the moving truck a fixed or variable input? Explain. Determine the total cost (TC), total fixed cost (TFC), total variable cost...
Suppose Kis the fixed input and L the variable input. Price of K = $6; Price of L=? KLTP MP|FC|VC TC AFC AVC ATC MC O 90 al 1. Refer to Table 1. Price of L = $_ 10 20
The total cost (TC) of producing computer software diskettes (Q) is given as: TC = 100 + 10Q. What is the; a. fixed cost (FC), b. variable cost (VC), c. marginal cost (MC), d. average fixed cost (AFC), e. average variable cost (AVC), f. average total cost (ATC)?
for question 2 use the information in picture 2 and use as much deatil as possible. 2) With "generic" graphs, illustrate the profit maximizing quantity, price, and ATC from the solution in #1. Make sure to draw an ATC, AVC, MC, and MR curve. ATC MC MR. The table below provides the values for different types of costs. Note that FC is fixed at 3 for all . This gives VC-TC - FC Next we find AVC - VC/O and...
1. When ONLY Total Costs (TC) are known, explain how to calculate each of the following: a. Fixed Costs (FC) b. Variable Costs (VC) c. Average Variable Costs (AVC) d. Average Total Costs (ATC) e. Average Fixed Costs (AFC) f. Marginal Costs (MC)
D Question 7 1 pts Use the following graph that shows the marginal cost (MC) curve, the Average Variable Cost (AVC) curve, and the Average Total Cost (ATC) curve. What is the variable cost when the quantity (Q) being produced is 6? P MC ATC /AVC $15 $11 $8 Q O $66 $8 O $15 $11 Question 8 1 pts Use the following graph that shows the marginal cost (MC) curve, the Average Variable Cost (AVC) curve, and the Average...