Question

Location Section Project A small logistic company named LogTransit currently has 3 manufacturing facilities (suppliers) calle

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Part I

i)

Let Xij represent quantity to be shipped from supplier i to customer j

LP model using Toledo (i=4)

Min 10X1A+14X1B+10X1C+12X2A+17X2B+20X2C+11X3A+11X3B+12X3C+18X4A+8X4B+14X4C

s.t.

X1A+X1B+X1C <= 200

X2A+X2B+X2C <= 140

X3A+X3B+X3C <= 150

X4A+X4B+X4C <= 200

X1A+X2A+X3A+X4A = 220

X1B+X2B+X3B+X4B = 220

X1C+X2C+X3C+X4C = 220

Xij >= 0

-----------------

LP model using Cincinnati (i=5)

Min 10X1A+14X1B+10X1C+12X2A+17X2B+20X2C+11X3A+11X3B+12X3C+7X5A+17X5B+13X5C

s.t.

X1A+X1B+X1C <= 200

X2A+X2B+X2C <= 140

X3A+X3B+X3C <= 150

X5A+X5B+X5C <= 200

X1A+X2A+X3A+X5A = 220

X1B+X2B+X3B+X5B = 220

X1C+X2C+X3C+X5C = 220

Xij >= 0

--------------------------------------------------------------------------------------------------------------------------------

ii)

Solution using Excel Solver for Toledo

Create Excel model as follows:

B C D E А Parameter Table 1 2 A B с Capacity 3 #1 10 14 10 200 4 # 2 12 17 20 140 11 12 150 8 14 200 220 220 5 #3 11 6 #4 - T

Enter Solver Parameters as shown below:

Solver Parameters X Set Objective: SE$18 To: Max Min Value Of: 0 By Changing Variable Cells: $B$11:$D$14 Subject to the Const

Click Solve to generate the solution. Values appear automatically in yellow cells (B11:D14)

С D E F G Н K L M N O B с S Solver Results X 14 10 20 17 А B 1 Parameter Table 2 A 3 #1 10 4 #2 12 5 # 3 11 6 #4 - Toledo 18

Click OK

Total cost using Toledo = 6,590

-

Solution using Excel Solver for Cincinnati

Change the cost data in B6:D6 and again run the Solver (by opening Solver Parameters and clicking Solve button on it)

Result is following:

E18 @fx =SUMPRODUCT(B3:06,B11:014) A B С D E F G Н K M N O 1 Parameter Table 2 A B с Solver Results 3 #1 10 14 10 Capacity 20

Total cost using Cincinnati = 6,840

--------------------------------------------------------------------------------------------------------------------------------

iii)

In part (ii), we see that total cost using Toledo is lower (6590).

Therefore, Toledo should be selected

Add a comment
Know the answer?
Add Answer to:
Location Section Project A small logistic company named LogTransit currently has 3 manufacturing facilities (suppliers) called...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Using the LP Formulation below and excel solver, explain step by step how to turn it...

    Using the LP Formulation below and excel solver, explain step by step how to turn it into a linear programming model. Decision Variables: Let xij= units to be shipped from supplier I to customer j, where i= 1- supplier 1 = 2- supplier 2 = 3- supplier 3 = 4- Toledo supplier j= A- customer a = B- customer b = C- customer c Objective Function: The objective is to minimize transportation costs with Toledo supplier.           10x1a+14x1b+10x1c+12x2a+17x2b+20x2c+11x3a+11x3b+12x3c+18x4a+8x4b+14x4c Constraints: Supplier...

  • Edwards Manufacturing Company purchases two component parts from three different suppliers The suppliers have limited...

    Edwards Manufacturing Company purchases two component parts from three different suppliers The suppliers have limited capacity, and no one supplier can meet all the company's needs. In addition, the suppliers charge different prices for the components. Component price data (in price per unit) are as follows: Supplier                   Component 1 2 3                  1 $12 $13 $14 2 $10 $11 $10 Each supplier has a limited capacity in terms of the total number of components it can supply. However, as long as...

  • The distribution system for the Herman Company consists of three plants, two ware- houses, and fo...

    The distribution system for the Herman Company consists of three plants, two ware- houses, and four customers. Plant capacities and shipping costs per unit (in $) from each plant to each warehouse are as follows: Warehouse Plant 1 2 Capacity 1 4 7 450 2 8 5 600 3 5 6 380 Customer demand and shipping costs per unit (in $) from each warehouse to each customer are as follows: Customer Warehouse 1 2 3 4 1 6 4 8...

  • Edwards Manufacturing Company purchases two component parts from three different suppliers. The suppliers have limited capacity,...

    Edwards Manufacturing Company purchases two component parts from three different suppliers. The suppliers have limited capacity, and no one supplier can meet all the company's needs. In addition, the suppliers charge different prices for the components. Component price data (in price per unit) are as follows: Component Supplier 1 2 $12 $13 $11 $12 3 $10 $10 Se 2 Each supplier has a limited capacity in terms of the total number of components it can supply. However, as long as...

  • 3. (10 pts) Flanger is an industrial distributor that sources from hundreds of suppliers. Flanger uses...

    3. (10 pts) Flanger is an industrial distributor that sources from hundreds of suppliers. Flanger uses a third party transportation company to ship its products. The two modes of transportation available for inbound shipping are LTL (less than truckload) and TL (truckload). LTL shipping costs $1 per unit, whereas TL shipping costs $400 per truck. Each truck can carry up to 1,000 units, Flanger wants to decide the shipping mode (TL or LTL) based on annual demand of the products....

  • The distribution system for the Herman Company consists of three plants, three warehouses, and four customers....

    The distribution system for the Herman Company consists of three plants, three warehouses, and four customers. Plant capacities and shipping costs per unit (in $) from each plant to each warehouse are as follows: Warehouse Plant Capacity 1 2 3 1 450 200 500 300 2 600 50 250 200 3 380 100 400 250 Shipping costs per unit (in $) from each warehouse to each customer are as follows: Customer Warehouse 1 2 3 4 1 100 50 75...

  • A linear programming computer package is needed. Edwards Manufacturing Company purchases two component parts from three...

    A linear programming computer package is needed. Edwards Manufacturing Company purchases two component parts from three different suppliers. The suppliers have limited capacity, and no one supplier can meet all the company's needs. In addition, the suppliers charge different prices for the components. Component price data (in price per unit) are as follows. Supplier Component 2 1 $11 $12 $13 2 $9 $10 59 Each supplier has a limited capacity in terms of the total number of components it can...

  • Apply the Concepts Kramer Company currently produces a high-tech medical product with 20 parts. Design engineering has...

    Apply the Concepts Kramer Company currently produces a high-tech medical product with 20 parts. Design engineering has produced a new configuration for the product that requires only eight parts. Current activity capacity and demand (20-part configuration) and expected activity demand (8-part configuration) are provided. Activity Capacity Current Expected Activity Activity Demand Demand Activities Activity Driver Material usage Number of parts 300,000 300,000 15,000 7,500 Assembling parts Direct labor hours 15,000 15,000 Purchasing parts Number of orders 20,000 15,000 9,750 Additionally,...

  • 5. A television company ships televisions from three warehouses to three retail stores on a monthly...

    5. A television company ships televisions from three warehouses to three retail stores on a monthly basis. Each warehouse has a fixed supply per month, and each store has a fixed demand per month. The manufacturer wants to know the number of television sets to ship from each warehouse to each store in order to minimize the total cost of transportation. Each warehouse has the following supply of televisions available for shipment per month: Warehouse Supply (member of sets) 1....

  • To complete this project you have to make a presentation of 10 slides and a written...

    To complete this project you have to make a presentation of 10 slides and a written report on the following: Transportation models and its usage. Analyze the following facility location case and solve it as a linear program formulation. Which of the new locations will yield the lowest cost for the firm in combination with the existing plants and warehouses? The Hardgrave Machine Company produces computer components at its plants in Cincinnati, Salt Lake City, and Pittsburgh. These plants have...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT