continuation of the question:-
From origin 2 to Destination 4 = 4
Solve the problem using transportation method and determine the
total transportation costs associated with the optimal
schedule.
The model is shown below
The formulas used is shown below
The solver parameters are shown below
The result is shown below. It is highlighted in yellow.
continuation of the question:- From origin 2 to Destination 4 = 4 Solve the problem using...
transportation engineering
Two highways connect an origin-destination pair, having performance functions t1 = 5 + 4(x1/01) and t2 = 4 +5(x2/2) for routes 1 and 2, respectively. For the performance functions, the t's are in minutes, and the flows (X's) and capacities (C's) are in thousands of vehicles per hour. The total traffic demand for the two highways is 3,036 vehicles during the peak hour. The capacities of routes 1 and 2 are 3600 veh/h and 4500 veh/h, respectively, Determine...
Q3. Suppose that you are required to plan the least-cost transportation from the manufacturing centers to the outlets. The transportation cost matrix is given below. Destination 1 Destination 2 Destination 3 Supply Origin 1 20 17 4 120 Origin 2 35 10 5 60 Demand 40 30 110 180 a. Find the initial basic feasible solution using Vogel’s Approximation Method. (5 Marks) b. Find the final (optimal) solution using Modified Distribution method. (5 Marks) Pls write answer step-by-step with conclusion...
Problem 2 This is the continuation of Problem 2 in Homework 3, but with questions about tradable permits. Two steel factories are currently emitting 8,000 tons of pollution each (for a total of 16,000 tons). Pollution reduction (abatement) costs for Plant 1 are given by MCR1= 0.02Q and for Plant 2 by MCR2 = 0.03Q, where Q represents tons of abatement, and MCR the marginal cost of pollution reduction. Suppose a tradable permit system is instituted in which permits for...
The last questions choices are customer 1,customer 2, customer
3, customer 4 demand has a shortfall
of 2000,4000,6000,8000,10000
customer 1, customer 2, customer 3, customer 4 demand of
2000,4000,6000,8000,10000
Klein Chemicals, Inc., produces a special oil-based material that is currently in short supply, Four of Klein's customers have already placed orders that together exceed the combined capacity of Klein's two plants. Klein's management faces the problem of deciding how many units it should supply to each customer. Because the four...
Transportation Problem A firm has four manufacturing plants and four warehouses. It is trying to determine the optimal way to ship from its plants to the warehouses. The plant capacities and warehouse requirements are as follows: Plant Capacity Warehouse requirement 1 = 1200 A = 3100 2 = 4200 B = 1800 3 = 5000 C = 2000 4 = 2000 D = 4400 A union requirement prohibits the firm from shipping...
1. Glitter Glow Machine Company is a Nigerian company that manufactures washing machines located in Lagos and Enugu, in Nigeria. These are shipped to regional distribution centers in Kaduna, and Benin, where they are delivered to the supply houses in Sokoto Sapele and Sagamu, as shown in the Figure below. Destination Transshipment Point Source Supply Sokoto Node 5 450 Lagos Node 1 800 Kaduna Node 3 Node 6 350 Enugu Node 2 Benin 700 Node 4 Shagamu Node 7 300...
Question 2: The origin-destination (O-D) trips for a three-zone system were predicted using a trip distribution model as shown below. O-D Trip Table (Person trips) Destination zone Origin zone 22 32 le 2120 233e 18312 2e 263e 4825 32272 32 229 358 1293 Assume that person trips are made by two modes - automobile and transit. Interzonal and intrazonal travel times by these two modes are shown below: Auto Travel Time (min) Destination zone Origin zone 2e le 2.4 11.02...
Problem 2: A total of 725 auto-mode social/recreational trips are made from an origin (residential area) during the peak hour. A logit model estimation is made, and three factors were found to influence the destination choice: () population at the destination, in thousands (coefficient 0.17), (2) distance from origin to destination, in miles (coefficient-0.23) and (3) square feet of amusement floor space (movie theaters, video game centers, etc.), in thousands (coefficient = 0.10). Four possible destinations have the following characteristics...
Problem 2. (10 points) Froberg Aerospace LLC. has three plants producing small-sat propulsion units that are to be shipped to four distribution centers. Plants 1, 2, and 3 produce 12, 17, and 11 shipments per month, respectively Each distribution center needs to receive 10 shipments per month. The distance from each plant to the respective distribution centers is given below Distance to Distribution Center Miles Distribution Center1 800 1,100 600 Distribution Center2 1,300 1,400 1.200 Distribution Center 3 400 600...
ABC soft drink manufacturing company produces soda bottles at three plants: Orlando, Tampa, and Miami. They ship them to major distribution centers in Charlotte. Birmingham, and Tallahassee. The accounting, production, and marketing departments have provided the information in the table below, which shows the unit cost of shipping between any plant and distribution center, plant capacities over the next planning period, and distribution center demands. ABC's supply chain manager faces the problem of determining how much to ship between each...