No need to show work! Thank you!
No need to show work! Thank you! A new highway is designed to go under perpendicular...
You are designing a new road for a two-lane highway. In order to intersect with an existing road, the new road must meet the existing road at an elevation of 440.50 ft at station 192+ 56.00 Your new road has an initial tangent of +2.0% and a final tangent of-1.5%. The PVI is located at station 19150.00 and elevation 450.00 ft. Find the length of the curve necessary for this alignment. What is the maximum recommended design speed limit based...