  1. Capacity planning is generally viewed in three categories of time duration – long range, short range, and intermediate range planning.
    1. Capacity planning that involves new tooling and the hiring of new personnel would fall into which of these three planning timeframes?
    2. Provide an example of capacity planning elements that would require a long range planning horizon.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Capacity Planning: Is generally defined as the process that determines the production capacity for an organization to meet the changing production demand for its products.

In simple terms it’s the time taken required for the organization to manufacture a product with in a given time.

Because every company set a time to meet the demand in the market for a product. Based on that the time that is required to manufacture and supply a product in a timely manner is very important to meet the market demand. In such cases if the capacity is not properly calculated according to the time required to complete a process than it would fail to meet the demand.

Short Range: Is a capacity that has issues in the short run like scheduling, labour shifts and proper use of resources. The intention behind the short range is to meet the unexpected issues in an efficient way. The short range is basically referred to short term like weekly or quarterly. The capacity planning followed to rectify the issues with in that time frame.

Intermediate Range: In simple terms it is defined as it is the capacity that match the capacity and demand. Basically its range is limited to two to three years. Because these are considered as an intermediate capacity that requires the organization on that particular time range.

Long Range: Is basically set by the management in the organization. It is actually determined by keeping the long term goals of the organization. The capacity basically consider can long range because it combines with the organization capacity like effective, design, production and sustainability.

  1. Answer: Long range because new tools and the hiring of new personal are considered for long run results. The training of new personnel is for present and future use. Whereas new tools are very important for the organization to improve and meet its desired quality standards. This is applicable for long terms results or benefits to the organization. The time frames are considered by keeping future projects. At the same time to meet the production, organization sustainability and design new process and its effectiveness all can be meet.
  1. Answer: The capacity planning elements that that require for a long range planning horizon are:
  • Capability
  • Gap management
  • Business Integration
  • Beyond thinking

Every organization need to understand its capability to organize the things in such a way to achieve the organizational goals. Most of the organizations fails to perform due to non-capability in handling the resources.

If there are any gaps between the management and low level staff is also another reason for the organization to meet the required demand. Proper planning and communication is more important in the organization for smooth process. Communicating with various management builds great relationship and helps to easy communicate. All the information will be moved throughout the management towards organizational goals.

If there are any issues in the organization that can be solved due to all level integration. Because all included have immediate solution for all the problems in the organization.

Beyond thinking process helps the management to think out of the box in solving different issues in the organization. Every project has its own issues so every time the issues are not same and sometimes unexpected issues occurs that need beyond thinking to resolve.

Add a comment
Know the answer?
Add Answer to:
Capacity planning is generally viewed in three categories of time duration – long range, short range,...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. Facilities planning refers to: A. Medium-range capacity decisions B. Have no impact on other c...

    1. Facilities planning refers to: A. Medium-range capacity decisions B. Have no impact on other capacity decisions C. Are long-term in nature. D. Require planning for one year or less 2. Under exponential smoothing, if we want the forecast for the next period to be closer to current period actual demand, the value of alpha (a) should be: A. Large (close to 1.0) B. Small (close to zero) C. Zero D. The value of alpha will have no impact on...

  • E) Only (a) and (b) above 15. In project scheduling, when three time estimates are given...

    E) Only (a) and (b) above 15. In project scheduling, when three time estimates are given for each activity i just one time estimate, the project scheduling method used is called: A) CPM B) PERT D) Kanban E) None of the above 16. With regard to time horizons in capacity planning, aggregate planning differs scheduling in that aggregate planning: A) is for the long-range and scheduling is for the short-range. B) is for the short-range and scheduling is for medium-range....

  • Type of care provided Care in this capacity can range from a short-term to long-term based...

    Type of care provided Care in this capacity can range from a short-term to long-term based upon the changing needs of the patient. Patient age can range from pediatric to elderly. Care can be provided in the patient’s private home, group home, or assisted living setting. Medical homes fall into this category and are a new focus of Accountable Care Organizations through the Affordable Care Act of 2010. Scenario In home care, a patient is visited at home by a...

  • Process of predicting a future event is known as Forecasting End casting Both A & B...

    Process of predicting a future event is known as Forecasting End casting Both A & B None of the above Short range forecasting time horizon is Up to 1 year, generally less than 3 months Purchasing, job scheduling, workforce levels, job assignments, production levels Both A & B None of the above Medium/long range forecasts deal with more comprehensive issues and support management decisions regarding planning and products, plants and processes True False Technological forecasts Address business cycle – inflation...

  • Case Study Demand Forecasting For an organization to provide customer delight it is important that organization...

    Case Study Demand Forecasting For an organization to provide customer delight it is important that organization can understand what customer wants and how much do they want. If an organization can gauge future demand that manufacturing plan becomes simpler and cost-effective. The process of analyzing and understanding current and past information to understand future patterns through a scientific and systemic approach is called forecasting. And the process of estimating the future demand of the product in terms of a unit...

  • QUESTION 3 3) After the examine the three approaches, Amanda would like Han to analyze the...

    QUESTION 3 3) After the examine the three approaches, Amanda would like Han to analyze the financial viability of the new plant and calculate the profitability index, NPV, and IRR. Choice 2 Capital Budgeting Decision Since LSUS corporation is producing at full capacity, Amanda has decided to have Han examine the feasibility of a new manufacturing plant. This expansion would represent a major capital outlay for the company. A preliminary analysis of the project has been conducted at a cost...

  • DO NOT ANSWER AT ALL IF YOU ARE ONLY ANSWERING 5 QUESTIONS THANK YOU True or...

    DO NOT ANSWER AT ALL IF YOU ARE ONLY ANSWERING 5 QUESTIONS THANK YOU True or false Process design includes selecting the appropriate technology, sizing the process over time, determining the role of inventory in the process, and locating the process. Operations and supply chain strategy is concerned with setting broad policies and plans for using the resources of a firm and must be integrated with corporate strategy. "Social" pertains to fair and beneficial business practices toward labour, the community,...

  • Showtime Sound & Lighting (SSL) Inc. is one of three small businesses owned by Tom Smith....

    Showtime Sound & Lighting (SSL) Inc. is one of three small businesses owned by Tom Smith. SSL’s line of business is centered on providing services for the local entertainment industry as well as other organizations such as civic groups and churches in need of support for large gatherings. SSL’s services range from simple DJ services to rental and sale of audio, video, and lighting equipment. Support may be provided on either a continuous or a one-time basis. SSL has noticed...

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical Industry. One of the company's products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2.380 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical Industry. One of the company's products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2.380 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT