Question

In a rain event in the basin Rainpourshed, total rainfall in five hours is 7.5 inches. The infiltration rate is assumed as 0.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Solution- Toral Rainfall depth = 7.5 inch. Rainfall duation = shocus. infil heation Rate: 0.5inch he Total Ran off = 10,000

Add a comment
Know the answer?
Add Answer to:
In a rain event in the basin Rainpourshed, total rainfall in five hours is 7.5 inches....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 6. Total direct runoff was measured as 5.0 inches from the | following total rainfall hyetograph....

    6. Total direct runoff was measured as 5.0 inches from the | following total rainfall hyetograph. Find a Phi (d) index [15] t (in/hr) to separate infiltration loss. 4 3 2 3 4 Time (hr) □0.3 □0.5 □ 0.4

  • 2. Two tipping bucket rain gauges (in the same basin) are used to collect the following...

    2. Two tipping bucket rain gauges (in the same basin) are used to collect the following rainfall data in the table below a. Calculate the mean daily rainfall intensity for each station (mm/hr) b. Calculate the maximum 2-hour intensity for each station (mm/hr). c. Calculate the maximum 6-hour rainfall intensity for each station (mm/hr) d. Using the arithmetic mean method and knowing the drainage basin area is 176 mi' (square miles), calculate the total volume of rainfall (m) delivered to...

  • 3 and 4 3. Discharge rates for a flood hydrograph passing the outlet of a 600-acre...

    3 and 4 3. Discharge rates for a flood hydrograph passing the outlet of a 600-acre drainage basin is given below. The flood was produced by a uniform rainfall rate of 2.75 in/hr, which started at 9 am and ended abruptly at 11 am. Time (hr)Q (cfs) 8:00 AM100 9:00 AM100 10:00 AM 300 11:00 AM 500 12:00 PM 700 1:00 PM800 2:00 PM600 3:00 PM400 4:00 PM 300 5:00 PM 6:00 PM 100 7:00 PM100 200 a) At what...

  • Problem 7.2.a) The Philip and Green-Ampt equations provide models for “infiltration capacity” (or “potential infiltration”). What...

    Problem 7.2.a) The Philip and Green-Ampt equations provide models for “infiltration capacity” (or “potential infiltration”). What assumptions are used in the development of the Philip and Green-Ampt infiltration capacity models? Clearly explain the difference between actual infiltration rate and infiltration capacity (potential infiltration). Under what specific conditions are the two the same? b) State the condition that for a given rainfall (or snowmelt) event would never generate infiltration excess runoff. This should be written in terms of the rainfall/melt rate...

  • *JJ 19-3 Try your hand at modeling runoff in a very simple way. Runoff (Q) is...

    *JJ 19-3 Try your hand at modeling runoff in a very simple way. Runoff (Q) is the volumetric flow resulting from what is called "excess precipitation" (precipitation minus abstractions). For this problem, the only abstraction is infiltration. Calculate runoff in m/h assuming a 1.0-hectare area (10,000 m2) divided into half permeable and half impermeable (no infiltration) areas. For the permeable area, use the following Horton parameters: fo-2.0 cm/hr, f-0.3 cm/h, k-2.5 h'. Apply a constant 0.4 cm/h rainfall. If the...

  • ENGINEERING HYDROLOGY CIVL431 Assignment1 Problem 11 The following data were observed at Demirkopru Dam site on...

    ENGINEERING HYDROLOGY CIVL431 Assignment1 Problem 11 The following data were observed at Demirkopru Dam site on Gedir River in June 1971. Find the monthly evaporation in mm from the reservoir surface of this dam. If there were a Class A pan installed nearby the reservoir, what would be the monthly evaporation observed from this pan? Storage at the beginning of the month 4XY.X-10 m Storage at the end of the month 47XY -10 m Average surface area of reservoir in...

  • ENGINEERING HYDROLOGY CIVL431 Assignment #1 Problem 11 The following data were observed at Demirköprü Dam site...

    ENGINEERING HYDROLOGY CIVL431 Assignment #1 Problem 11 The following data were observed at Demirköprü Dam site on Gediz River in June 1971. Find the monthly evaporation in mm from the reservoir surface of this dam. If there were a Class A pan installed nearby the reservoir, what would be the monthly evaporation observed from this pan? Storage at the beginning of the month : 4XY.Z - 10 m Storage at the end of the month 47x V -10 m Average...

  • ENGINEERING HYDROLOGY CIVL431 Assignment #1 Problem 11 The following data were observed at Demirköprü Dam site...

    ENGINEERING HYDROLOGY CIVL431 Assignment #1 Problem 11 The following data were observed at Demirköprü Dam site on Gediz River in June 1971. Find the monthly evaporation in mm from the reservoir surface of this dam. If there were a Class A pan installed nearby the reservoir, what would be the monthly evaporation observed from this pan? Storage at the beginning of the month : 4XY.Z - 10 m Storage at the end of the month 47x V -10 m Average...

  • ull peal - OX Share Comments AutoSave Off 2 0 - Quiz 3_2 (1) - Compatibility...

    ull peal - OX Share Comments AutoSave Off 2 0 - Quiz 3_2 (1) - Compatibility Mode - Word Search File Home Insert Design Layout References Mailings Review View Help Times New Rom 12 AA Aa A Eva EE 7 AL | Paste BI U veb xx? APA SIE DI La АаВЬСc) АаВЬСcІ Аавьсс Аавьссс Аав — Heading 1 1 Normal 1 No Spac.. Heading 2 Title sinca nasce Aabe Find Sc Replace h Select Dictate Sensitivity Editor Clipboard Font...

  • Hydrology ENV 321 Homework #1 Due: Friday, September 6 at 1:00pm 1. Convert (show all conversion...

    Hydrology ENV 321 Homework #1 Due: Friday, September 6 at 1:00pm 1. Convert (show all conversion steps for full credit; convert only one unit for cach step as demonstrated in class): a) acre-feet/day to mgd (mgd is million gallons per day] b) cfs to cms c) inches/hr rainfall to mm/day rainfall d) short tons/acre-day to Mg/hectare-year [Mg is megagrams e) inches"F to cm/ C [be careful, this one may trick you] 2. Define the hydrologic cycle component and indicate how...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT