Question

The Silver Star Bicycle Company will manufacture both men's and women's models for its Easy-Pedal bicycles...

The Silver Star Bicycle Company will manufacture both men's and women's models for its Easy-Pedal bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men's and 125 women's models to be shipped during the first month and 200 men's and 150 women's models to be shipped during the second month. Additional data are shown:

Labor Requirements (hours)
Production
Model

Costs

Manufacturing

Assembly
Current
Inventory
Men's $120 2.0 1.5 20
Women's $90 1.6 1.0 30

Last month, the company used a total of 1,000 hours of labor. The company's labor relations policy will not allow the combined total hours of labor (manufacturing plus assembly) to increase or decrease by more than 100 hours from month to month. In addition, the company charges monthly inventory at the rate of 2% of the production cost based on the inventory levels at the end of the month. The company would like to have at least 27 units of each model in inventory at the end of the two months. Hint: Define variables for production and inventory held in each period for each product. Then use a constraint to define the relationship between these: inventory from end of previous period + produced this period - demand this period = inventory at end of this period.

(a) Establish a production schedule that minimizes production and inventory costs and satisfies the labor-smoothing, demand, and inventory requirements. What inventories will be maintained and what are the monthly labor requirements?
If required, round your answers to nearest whole number. If your answer is zero, enter “0”.
Production schedule: The optimal solution is as follows
Production Schedule Men's Model Women's Model
Month 1
Month 2
Total Cost = $
Inventory Schedule
Men's Women's
Month 1
Month 2
If required, round your answer to two decimal places.
Labor Levels
Previous month hours
Month 1 hours
Month 2 hours
(b) If the company changed the constraints so that monthly labor increases and decreases could not exceed 50 hours, what would happen to the production schedule? If required, round your answers to nearest whole number.
Production schedule: The revised optimal solution is as follows
Production Men's Model Women's Model
Month 1
Month 2
Total Cost = $
How much will the cost increase?
$
What would you recommend?
The input in the box below will not be graded, but may be reviewed and considered by your instructor.

blank

0 0
Add a comment Improve this question Transcribed image text
Answer #1

ay prodacion Schedlle pue ton Sehedule ens ademens ode womenS Month Mon th2 Total cost -$6a,1s6 1a3 16 9 ITS h venToru Schea

Add a comment
Know the answer?
Add Answer to:
The Silver Star Bicycle Company will manufacture both men's and women's models for its Easy-Pedal bicycles...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The Silver Star Bicycle Company will manufacture both men's and women's models for its Easy-Pedal bicycles...

    The Silver Star Bicycle Company will manufacture both men's and women's models for its Easy-Pedal bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men's and 125 women's models to be shipped during the first month and 200 men's and 150 women's models to be shipped during the second month. Additional data are shown: Labor Requirements (hours)...

  • The Silver Star Bicycle Company will be manufacturing both men’s and women’s models of its Easy-Pedal...

    The Silver Star Bicycle Company will be manufacturing both men’s and women’s models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 170 men’s and 145 women’s models to be shipped during the first month and 210 men’s and 160 women’s models to be shipped during the second month. Additional data are shown: Production...

  • Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both men’s and women’s models...

    Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both men’s and women’s models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men’s and 125 women’s models to be shipped during the first month and 220 men’s and 170 women’s models to be shipped during the second month. Additional data...

  • please answer all of B and my answers for part A are correct. The Silver Star...

    please answer all of B and my answers for part A are correct. The Silver Star Bicycle Company will be manufacturing both men's and women's models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men's and 125 women's models to be shipped during the first month and 210 men's and 160 women's...

  • Please help and show work for all steps! Everything marked with a red X is incorrect....

    Please help and show work for all steps! Everything marked with a red X is incorrect. Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both men's and women's models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 160 men's and 135 women's models to be shipped during the first month...

  • The New England Cycle Company is planning next month’s production of its two bicycles: its B2...

    The New England Cycle Company is planning next month’s production of its two bicycles: its B2 tandem cycle built for two and its S10 single-rider 10-speed model. Both models use the same seats and tires. Management has been informed that 2000 seats, 1000 gear assemblies (only the S10 requires a gear assembly), and 2400 tires are available next month for production. On the average, it takes two hours to produce a B2 and three hours to produce a S10 bicycle....

  • Aside from selling yarn skeins, the Yarn Barn also plans to sell men’s and women’s hand-knit...

    Aside from selling yarn skeins, the Yarn Barn also plans to sell men’s and women’s hand-knit scarves during the next 2 months. The company wants to develop a production schedule indicating how many scarves of each type should be produced each month. Current demand forecasts show that 150 men’s and 125 women’s scarves are needed during the first month and 200 men’s and 150 women’s scarves are needed for the second month. Additional data are shown in Figure 2: Labour...

  • Also please solve by either using excel or R LP solvers The Magnetron Company manufactures and markets microwave ovens. Currently, the company produces two models: full-size and compact. Produc...

    Also please solve by either using excel or R LP solvers The Magnetron Company manufactures and markets microwave ovens. Currently, the company produces two models: full-size and compact. Production is limited by the amount of labor available in the general assembly and electronic assembly departments, as well as by the demand for each model. Each full-size oven requires 2 hours of general assembly and 2 hours of electronic assembly, whereas each compact oven requires 1 hour of general assembly and...

  • Coastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by...

    Coastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the size of the battery and the quality of the components. The bicycles are produced in two departments. The Assembly Department purchases components from vendors and assembles them into bicycles. The models E20 and E35 are complete and ready for sale after completing the assembly process. The model E60 undergoes further process in Customization Department, which is actually just a small area in the...

  • Helter Industries, a company that produces a line of women's bathing suits, hires temporaries to help...

    Helter Industries, a company that produces a line of women's bathing suits, hires temporaries to help produce its summer product demand. For the current four-month rolling schedule, there are 12 full-time employees on staff. Temps can be hired when needed and can be used as needed on a month-by-month basis, whereas the full-time employees must be paid whether they are needed or not. Each full-time employee can produce 203 suits, while each temporary employee can produce 163 suits per month.      ...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT