Question

Part 2: Two Data Sets and Overlay . Record the equations of the trendlines fitted to 1. Data set A: Data set B: Perform a simultaneous equations calculation to determine the x and y values for the point -0 . of intersection between these lines. Show your work below.

i got y= 0.7552869605 and x for 0.7567722681
by substitution. amd i wrong?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

356 965 Patting in

Add a comment
Know the answer?
Add Answer to:
i got y= 0.7552869605 and x for 0.7567722681 by substitution. amd i wrong? Part 2: Two...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 4. Find values for x and y that satisfy the simultaneous equations below and check your...

    4. Find values for x and y that satisfy the simultaneous equations below and check your answe If the two equations describe two lines, what do the x and y values you obtain represent? 3x+4y = 5 x+3y2 5. Evaluate (show work),J cos(x) dr

  • You may skip part (e) (x -R)2 0 4 (a) Complete the entries in the table....

    You may skip part (e) (x -R)2 0 4 (a) Complete the entries in the table. Put the sums in the last row. What are the sample means x and y? (b) Calculate bi and b2 using (2.7) and (2.8) and state their interpretation. (c) Compute )vi. Using these numerical values, show that (d) Use the least squares estimates from part (b) to compute the fitted values of y, and plete the remainder of the table below. Put the sums...

  • PLEASE SHOW ALL WORK As you can see, i got the first part wrong :/ 1....

    PLEASE SHOW ALL WORK As you can see, i got the first part wrong :/ 1. A particular accelerator can accelerate electrons to an energy of 37 GeV. What is the de Broglie wavelength of these electrons? What fraction of a proton's diameter (d ~ 2 Times 10^-15 m) can such a particle probe?

  • Problem Two: (Based on Chapra, Problems 12.9 Consider the simultaneous nonlinear equations: 2-5-y y+i- 1. Plot...

    Problem Two: (Based on Chapra, Problems 12.9 Consider the simultaneous nonlinear equations: 2-5-y y+i- 1. Plot the equations and identify the solution graphically. Page 1 of 2 2. Solve the system of equations using successive substitution, starting with the initial guess xo-y-1.5. Show two complete iterations. Evaluate &s for the second iteration. 3. Redo Part 2 using Newton-Raphson method . Automate the solutions in Parts 2 and 3 using MATLAB scripts 5. Solve the system of nonlinear equations by calling...

  • (x -R)2 0 4 (a) Complete the entries in the table. Put the sums in the...

    (x -R)2 0 4 (a) Complete the entries in the table. Put the sums in the last row. What are the sample means x and y? (b) Calculate bi and b2 using (2.7) and (2.8) and state their interpretation. (c) Compute )vi. Using these numerical values, show that (d) Use the least squares estimates from part (b) to compute the fitted values of y, and plete the remainder of the table below. Put the sums in the last row. yi...

  • 1) Show that two lines are skew x+1 y+2 z+3 4:x=y=z and L: +7=5 2) Find...

    1) Show that two lines are skew x+1 y+2 z+3 4:x=y=z and L: +7=5 2) Find the general equation of the plane containing the point P (1,2,3 ) and L, . 3) Find the point Q-the point of intersection the plane found in 2) and the line L. 4) Find the distance from the point (1,-1,2) to the line Lą.

  • I got some of it wrong and need it fixed to complete my next assignment. 10...

    I got some of it wrong and need it fixed to complete my next assignment. 10 Required information [The following information applies to the questions displayed below.] Listed here are the total costs associated with the production of 1,000 drum sets manufactured by TrueBeat. The drum sets sell for $499 each. Part 2 of 2 3/6 points awarded Scored Costs 1. Plastic for casing-$16,000 2. Wages of assembly workers-$85,000 3. Property taxes on factory-$5,000 4. Accounting staff salaries-$35,000 5. Drum...

  • I had a few questions in Computer Science (Java). I got these questions wrong and I...

    I had a few questions in Computer Science (Java). I got these questions wrong and I would like the CORRECT answer and an EXPLANATION PLEASE. Please use the correct number when giving the answer such as 1a:. 1b: etc 1. For Each of the following Bits of code enter the final value of the variable names ans. a. int x = 23; int y = 7; Int ans = x % y; My answer 1.61 (Wrong It was 2) b....

  • Solve the system. -3x+y+4z=1 x+y+z=0 -2x+z=-1 x+y-2z=0 Please show all steps! I thought I got the...

    Solve the system. -3x+y+4z=1 x+y+z=0 -2x+z=-1 x+y-2z=0 Please show all steps! I thought I got the correct answer but my numbers don't work for the last given equation. Thank you!

  • You may skip parts (e) and (f)- I still need parts (g), (h), (i), and (j)....

    You may skip parts (e) and (f)- I still need parts (g), (h), (i), and (j). (x -R)2 0 4 (a) Complete the entries in the table. Put the sums in the last row. What are the sample means x and y? (b) Calculate bi and b2 using (2.7) and (2.8) and state their interpretation. (c) Compute )vi. Using these numerical values, show that (d) Use the least squares estimates from part (b) to compute the fitted values of y,...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT