* with available bore log details, it shows clay is present upto 5m depth from Ground level and N values of less than 50 upto depth of 8.8m.
*from the details available amount of waste water to be treated or stored is not availble, taking the soil condition into consideration , with release or discharge of water into treatment plant or from the treatement plant , its not sutiable to have its foundation upto 9m depth from level.
* if its necessary to provide foundation at even lower depth like 0-5m from ground level we need consider in improving the soil properties like providing pile foundation to hard strata or upto 13m as N value is more than 50 and with presence of garavel its suitable to construct the large treatement plant.
Referring to below borehole log. Referring specifically to information provided on the borehole log- Would this...
3. A soil boring was drilled in a multi-layered deposit, as shown in the boring log below. A SPT was also performed at intervals of 1 m. A donut hammer and a liner sampler were used. Care was taken to connect the rod segments firmly and to follow standard procedure. a. Find the corrected Noo at the depths of 9 and 27 feet. b. What is the (N;) at the depth of 13 feet? c. Estimate the drained friction angle...
Using boring log data to determine soil properties ( ϕ’,c,γ) for
each soil layers (interpolation may be needed)
BORING LOG: BH-1 SHEET 1 o 1 PROJECT CONTRACTOR DRILLER: INSPECTOR: PROJECT CUIENT CUENT PROJECT COORDINATESN RIG TYPE DRILLING METHOD HAMMER TYPE SURFACE ELEV: 781.5 TOTAL DEPTH: 23 REF ALIGNMENT STATION OFFSET LOCATION: Tucson COMMENTS TIME TIME START DATE: FINISH DATE: cu L.D. O.D. Length Hammer WT Hammer Fall 622.75 N Drill Rod Size I.D. 1O.D.) BLOWS 762mm SOIL SAMPLE VISUAL MATERIAL...
1. A 12-story residential apartment is about to be built. The site investigate has been completed and the soil strata information is provided. The area of the footprint of the building is 100 x200 ft2 and the height of the building is 180 ft. The estimated vertical dead load of each story is 1000 kips and vertical live load is 15 psf. Based on the FEMA database, the building may be subjected to category S hurricane. a. Please design drilled...