Question

7.9 For Problem 7.2, calculate the optimal cycle length (Websters formulation) and the corres- ponding effective green times (based on lane group vlc equalization). Assume lost time is 4 seconds per timing stage.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

799) from the (given data mo of phases Tine lost hay pheset) - usee Phose) 2sec plange cu): Iset. e Ane 5-1o3oos N yech h

Add a comment
Know the answer?
Add Answer to:
7.9 For Problem 7.2, calculate the optimal cycle length (Webster's formulation) and the corres- ponding effective...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • An intersection has a four-phase signal with the movements allowed in each phase

     An intersection has a four-phase signal with the movements allowed in each phase and the corresponding analysis and saturation flow rates shown in the table below. Please complete the following: a. Calculate the sum of flow ratios for the critical lane groups.  b. Calculate the minimum cycle length and effective green time for each phase (balancing v/c ratio for each lane group). Assume the lost time is 4 sec/phase and a critical intersection vc ratio of 0.95 is desired. c. Calculate the optimal...

  • Description D to solve Questions 12-14 An intersection has a four-timing-stage signal with the movements allowed...

    Description D to solve Questions 12-14 An intersection has a four-timing-stage signal with the movements allowed in each timing stage and corresponding analysis and saturation flow rates shown in Table below. Timing stage 1 2 3 4 Allowed movements EB L, WBL EB T/R, WB T/R SB L, SB T/R NB L, NB T/R Analysis Flow rate 245, 230 veh/h 975,1030 veh/h 255,235 veh/h 225,215 veh/h Saturation flow rate 1750, 1725 veh/h 3350,3400 veh/h 1725,1750 veh/h 1700, 1750 veh/h Question...

  • 4- Consider Problem 3. Calculate the new minimum pedestrian green time, assuming the effective crosswalk width...

    4- Consider Problem 3. Calculate the new minimum pedestrian green time, assuming the effective crosswalk width is 6 ft and the maximum number of crossing pedestrians in any phase is 20. This is the problem 3 Two additional 12-ft through lanes are added to Vine Street, one lane in each direction. If the peak-hour traffic volumes are unchanged but the Vine Street left-turn saturation flow rates increase by 120 veh/h because of the added through lanes, what would the revised...

  • The intersection has a four-timing-state signal with the movements allowed in each timing stage a...

    the intersection has a four-timing-state signal with the movements allowed in each timing stage and corresponding analysis and saturation flow rates shown in the table. a) calculate the minimum cycle length and effective green time for each timing stage (balancing v/c for the critical lane groups). assume the lsot time is 4 seconds per timing stage and a criticsl intersection v/c of 0.9 is desired. b) calculate the intersection control delay and level of service, assumjng pre-times isolated intersection. 4...

  • Pulu tu d e8htractor to balance the cut and fill between stations 10+00 and 15+00. Problem #2: Th...

    pulu tu d e8htractor to balance the cut and fill between stations 10+00 and 15+00. Problem #2: The "T" intersection shown has Yellow Interval of 3 seconds. Lost time per phase is 5 seconds and saturation and peak hour flows are: Saturation Peak hour flow Lane Group a1 a2 b1 C1 C2 Phase Flow 1500 450 1850 | 450 350 392 A (SB) 575 B (NB) 32 Calculate the actual red times and the actual green times for each phase....

  • An intersection has three phases, and the information for that intersection is provided in the ta...

    An intersection has three phases, and the information for that intersection is provided in the table below. Calculate: The sum of the flow ratios for the critical lane groups Minimum cycle length, optimal cycle length and effective green time for each phase using the minimum cycle length assuming the lost time is 4 seconds per phase and the critical intersection v/c of 0.90 is desired. The northbound approach delay and level of service. Phase 1 2 3 Allowed Movements NB...

  • Please help writing a well structured document using the below Agile Runbook - Our Overall Delivery Process How do we initiate a Project? Any project is a response to a pain point or desire expresse...

    Please help writing a well structured document using the below Agile Runbook - Our Overall Delivery Process How do we initiate a Project? Any project is a response to a pain point or desire expressed by either customers, internal stakeholders, employees, or regulatory authorities. In short, a project is a time bound and specific goal oriented task-system that is born out of an ask from any stakeholder. Project initiation is laying down a new project by defining its goals, objectives,...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • summatize the following info and break them into differeng key points. write them in yojr own...

    summatize the following info and break them into differeng key points. write them in yojr own words   apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT