Question

4- Consider Problem 3. Calculate the new minimum pedestrian green time, assuming the effective crosswalk width...

4- Consider Problem 3. Calculate the new minimum pedestrian green time, assuming the effective crosswalk width is 6 ft and the maximum number of crossing pedestrians in any phase is 20.

This is the problem 3

Two additional 12-ft through lanes are added to Vine Street, one lane in each direction. If the peak-hour traffic volumes are unchanged but the Vine Street left-turn saturation flow rates increase by 120 veh/h because of the added through lanes, what would the revised effective green time, yellow time, and all-red time be for each phase? Assume minimum cycle length and a critical intersection v/c of 0.95 is desired.

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
4- Consider Problem 3. Calculate the new minimum pedestrian green time, assuming the effective crosswalk width...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT