Question

4. For the traffic characteristics shown below, determine suitable phase lengths for the intersection using the Webster metho
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Saathi Date tuブ nch percentog e in tur staun une ven 一.and un a스 e con f- tonLe Divensu

0 Date peinte Pon n n Janes and short ng Confluck 1.

Add a comment
Know the answer?
Add Answer to:
4. For the traffic characteristics shown below, determine suitable phase lengths for the intersection using the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 19-5 Traffic Engineering 5th edition Develop a signal timing for intersection: N/S 30 ft (1 lane NB/ 1 lane SB) E/W 85 ft ( 3 lanes EB/ 3 lanes WB...with separate left turn lane on EB and WB approach)...

    19-5 Traffic Engineering 5th edition Develop a signal timing for intersection: N/S 30 ft (1 lane NB/ 1 lane SB) E/W 85 ft ( 3 lanes EB/ 3 lanes WB...with separate left turn lane on EB and WB approach) Veh/hr EB: Left - 200, Through - 800, Right 120 WB: Left - 160, Through - 1050, right - 100 NB: Left - 10, Through - 420, right - 10 SB: Left - 12, Through 400, right - 8 PHF =...

  • (15 points) Assume that all volumes shown have been converted to compatible through-car equivalent" values for...

    (15 points) Assume that all volumes shown have been converted to compatible through-car equivalent" values for the conditions shown. The phase plan in given in the following. Assume that critical volumes reverse in the other daily peak hour. The Saturation headway is 2 s/veh, start- up lost time is 1.5 s, clearance lost time is 2 s, Cycle length is 90s, only critical volumes shown and all volumes in tvu/h. Please determine: a. Find the appropriate number of lanes for...

  • 2. Determine the minimum cycle length for the intersection with the volumes shown on the table...

    2. Determine the minimum cycle length for the intersection with the volumes shown on the table below. The intersection is designed to have the following three phases: Phase A for left-turn movements from the EB and WB approaches; Phase B for the through and right movements from the EB and WB approaches; Phase C serving all movements for the NB and SB approaches. EB approach WB approach N B approach SB approach LT RLT RL TRL TR 110 500 200...

  • 4- Consider Problem 3. Calculate the new minimum pedestrian green time, assuming the effective crosswalk width...

    4- Consider Problem 3. Calculate the new minimum pedestrian green time, assuming the effective crosswalk width is 6 ft and the maximum number of crossing pedestrians in any phase is 20. This is the problem 3 Two additional 12-ft through lanes are added to Vine Street, one lane in each direction. If the peak-hour traffic volumes are unchanged but the Vine Street left-turn saturation flow rates increase by 120 veh/h because of the added through lanes, what would the revised...

  • 3- Consider the third example solved in the lecture videos. Two additional 12-ft through lanes are...

    3- Consider the third example solved in the lecture videos. Two additional 12-ft through lanes are added to Vine Street (the street in the intersection of the first example solved in the lecture videos), one lane in each direction. If the peak-hour traffic volumes are unchanged but the Vine Street left-turn saturation flow rates increase by 120 veh/h because of the added through lanes, what would the revised effective green time, yellow time, and all-red time be for each phase?...

  • SKAB / SKAA 3842 - 3- Q2. (a) Table Q2 below gives the flow and saturation...

    SKAB / SKAA 3842 - 3- Q2. (a) Table Q2 below gives the flow and saturation flow for all approaches (in pcu/hr) at unsignalised junction in Kluang district. The influence of heavy vehicles, turning movements and all other factors have already been considered. All approaches consist of one exclusive right turn lane (RT), one straight-through traffic (ST) and one straight- through shared with left turn (STLT). Table Q2: Traffic volume at unsignalised junction in Kluang district Approach NORTH SOUTH WEST...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT