(i) What is the difference between actual green time and effective green time.

Effective green time = Actual green time + amber time - total lost time

  • From the above formula, we understand that actual and effective green times are different terms, making option A wrong statement.
  • Total lost time include all red time or pedestrian crossing time. So actual green time include pedestrian time. But the statement C is not always true, because in intersections where pedestrian crossing are negligible, this pedestrian crossing time is omitted. Thus it is not the right answer denoting the difference between actual and effective green time.
  • Both HCM method and Webster method can be used to calculate effective green time. Thus option D is wrong

Thus the correct statement is, "actual green time include total lost time but effective green time exclude total lost time". Thus option (B) is correct.

References

1. Highway capacity manual

2. "Highway Engineering, tenth edition" , by S K Khanna, C E G Justo and A Veeraragavan.

Answer(i) : Option B

Add a comment
Know the answer?
Add Answer to:
What is the difference between actual green time and effective green time A They are the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Q1. A +2 percent grade on an arterial highway intersects with a -1 percent grade at...

    Q1. A +2 percent grade on an arterial highway intersects with a -1 percent grade at station (5+357.28) at an elevation of 90m. If the design speed of the highway is 100 Km/h, determine the stations and elevations of the BVC and EVC, the elevation of each 30-m station, and the higlh point Q2. Determine the minimum length of a vertical curve if the grades are +4% and-200. Design speed is 120 km/hr. State assumptions used in solving this problem....

  • A crest vertical curve connects a +2% grade and a -2.05% grade. The PVI is at...

    A crest vertical curve connects a +2% grade and a -2.05% grade. The PVI is at station 40+00.00 at an elevation of 100.00 ft. The design speed is 70 mi/h. If the length is 1084 ft, determine: (b) The station of the BVC (3 pts (c) The elevation of the BVC (3 pts (d) The station of the EVC (3 pts) (e) The elevation of the EVC (3 pts) (1) The station of the highest point on the curve (4...

  • Problem 4 A 500 ft long sag vertical curve passes under a bridge at station 82+45....

    Problem 4 A 500 ft long sag vertical curve passes under a bridge at station 82+45. The beginning of vertical curve (BVC) is at station 81+00. A-3.6% curve meets a +4.4% curve at the point of vertical intersection (PVI), which is at elevation 425.38 ft. What is the elevation of the point on the curve under the bridge? Problem 5 The grade into a vertical sag curve is -2%. The curve length is 1,400 ft. The grade out of the...

  • 4- Consider Problem 3. Calculate the new minimum pedestrian green time, assuming the effective crosswalk width...

    4- Consider Problem 3. Calculate the new minimum pedestrian green time, assuming the effective crosswalk width is 6 ft and the maximum number of crossing pedestrians in any phase is 20. This is the problem 3 Two additional 12-ft through lanes are added to Vine Street, one lane in each direction. If the peak-hour traffic volumes are unchanged but the Vine Street left-turn saturation flow rates increase by 120 veh/h because of the added through lanes, what would the revised...

  • 1) A horizontal curve is being designed around a pond with a tangent length of 1200...

    1) A horizontal curve is being designed around a pond with a tangent length of 1200 ft and central angle of 0.5211 radians. If the PI is at station 145+00, determine the station of PT. ⦁   168+45.43 ⦁   156+45.43 ⦁   173+94.00 ⦁   156+72.72 2) A car is traveling downhill on a suburban road with a grade of 3% at a speed of 35 mi/h. Determine the stopping sight distance based on a reaction time of 2.5 second, and a deceleration...

  • In vertical curve design what are the major assumptions made concerning the relationship between cord length, tangent le...

    In vertical curve design what are the major assumptions made concerning the relationship between cord length, tangent lengths, arc length and the distance between tangent points? Select one: a) Tangent lengths are different dependent upon entry and exit gradients, and this affects cord length. b) Arc length is half the distance between tangent points, but requires correction for gradient. c) Vertical curves must be designed in the same way as horizontal curves. d) The length of the chord equals the...

  • Question: An existing tunnel needs to be connected to a newly constructed bridge with sag and...

    Question: An existing tunnel needs to be connected to a newly constructed bridge with sag and crest vertical curves. The sag curve begins at station 0+00 and elevation 100 ft. and the crest curve ends at station 12+00 and elevation 140 ft. Station 12 +00, PVT Bridge deck elevation 140 ft Tunnel floor elevation 100 ft WURUK Station 0 + 00, PVC, Develop a vertical alignment to connect the tunnel and bridge by determining the highest possible common design speed...

  • 1.) What is the main difference between a competitive firm and a monopoly? a. A competitive...

    1.) What is the main difference between a competitive firm and a monopoly? a. A competitive firm owns a key resource, but a monopoly firm does not. b. A competitive firm is a price taker, and a monopoly is a price maker. c. A competitive firm produces output at a lower cost than a monopoly firm. d. A competitive firm is subject to government regulations, but a monopoly firm is not. 2.) What is the main social problem caused by...

  • Benjamin spends his time either watching movies (x1) (he uses "on demand" option, cable TV) or li...

    Benjamin spends his time either watching movies (x1) (he uses "on demand" option, cable TV) or listening to songs - MP3 downloaded from the Internet (x2) . His preferences are described by U(x1,x2) = ln(x1) + ln(x2) a) Derive Benjamin's demand for movies and MP3 files as a function of prices p1,p2, and his income m. (do not use Cobb Douglas formula but rather derive demand using "two secrets of happiness"). b) Fix the price of MP3 at p2 =...

  • Problem 1 (15vpts) A proposed highway has two tangents of bearings N 75° 54' 36" E...

    Problem 1 (15vpts) A proposed highway has two tangents of bearings N 75° 54' 36" E and N 53° 22' 30" W. The highway design engineer, attempting to obtain the best fit for the simple circular curve to join these tangents, decides that the external ordinate is to be 78.00 ft. The Pl is at station 65+43.21. Determine: (a) The external angle of the curve (A) (b) The radius of the curve (d) The station of the PC (f) The...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT