gain for a small office is 24,000 Btuh, and sensible heat gain is 20,000 Btuh. Determine...
Prob. # 2] The temperature to be maintained in an office building is 26 C DB heat is 77.6 kW and the latent heat gain is 14.3 kW. Th accomplished by passing it through a spray-type heated to 18 C then supplied to the room. Find and 18 C W B. The sensible e cooling and dehumidifying of the air is washer with water chilled by refrigeration. The air is then a. the apparatus dew point temperature of washer, b....
A building is designed for the following cooling loads. Room specific heat gain and latent heat gains are 310 kW and 100 kW respectively. The room is maintained at a dry bulb temperature of 25°C and relative humidity of 50%. The outdoor air is at 28°C with 50% relative humidity, 10% by mass of outdoor air is supplied to the building. If the air supplied to the room should be at a temperature lower than 18°C, detemine the following. (a)...
Question NO. 3 (25 points) A space to be maintained at 27°C dry-bulb temperature has a rate of sensible-heat gain of 13 kW and a rate of latent heat gain of 8.5 kW. The system used to condition the space to the required conditions. The mass flow rate of air supplied to the space is 1.1 kg/s. Outdoor air at 38 °C dry-bulb temperature and 17 ℃ dew-point temperature is introduced into the system at a rate of 0.28 kg/s....
a. the sensible heat ratio (SHR) for the cooling and dehumidifying process; (2 Marks) b. the supply air volume flow rate to the office in m3 /s; (5 Marks) c. the air dry bulb temperature and specific enthalpy of the mixture of outdoor and recirculating air; (4 Marks) d. the cooling coil’s load in kW. (5 Marks) e. the apparatus dew point during the cooling and dehumidifying process; and (4 Marks) f. Discuss, with reasons, the possible effects on the...
A motel in Miami, Florida has a sensible cooling load of 75 tons and a sensible heat ratio on the building of 0.85. Each of the motel's 100 rooms must be supplied with 30 cfm of outside air to satisfy the local ventilation codes. If the rooms are kept at 75F and 50% R.H., determine: a.) sketch of the system b.) Air flow to the building in cfm (fan size) c.) The mixed air condition-temperature and humidity d.) The cooling...
Subject Refrigeration and Air Conditioning. Please answer in detail. QUESTION 4 - COOLING AND DEHUMIDIFYING COILS An air conditioned space at 1700 metres altitude has a sensible heat gain of 26 kW and a latent heat gain of 6.5 kW. The space is maintained at 25°C dry bulb and 18°C wet bulb temperature:s The fresh air supply is to be 0.65 m3/s at 35°C dry bulb and 24°C wet bulb temperatures. The air leaving the coil has a relative humidity...
Question 4 Page 15 It is required to 125 marks] design a cold storage for storing vegetables with the following available data Outside design conditions 36°C DBT. 28 C WBT Inside design conditions T2 19°C DBT, 60% RH Infiltrated air 180 mhr V ms-7.83 kg/s Fresh air supplied from outside 4500 mhr Total mass of air supplied to the room Sensible heat gain through glass SH,5.5AW Sensible heat gain through walls and roof H 10.8 kW Ihr KJ Sensible heat...
An Conference Center is to be air-conditioned for a seating capacity of 3200 people for the following outdoor and comfort conditions a) Outdoor design conditions = 35 °C, db and 65% R.H b) Indoor/return design conditions-26 deg C. db and 55% RH. c) Total sensible room load = 420,000 kJ/hr d) Total latent room load = 200,000 KJ/hr e) The rise in dry bulb temperature of the air inside the conference center is limited to 9 °C (i.e. the Supply...
7. (25 Pts) A small business office of modern design is to be cooled by air conditioning units rated at 1.5 kW of cooling capacity. The office is designed to be occupied by a maximum of 25 individuals, and we can assume that a person would dissipate heat at a rate of 350 kJ/hr. The building is constructed with a lot of exposed glass and, as a result, heat transfer to the office on sunny days is estimated to occur...
The owner of a small office building asked you to design the new air conditioning system for the building. The system cools the air supplied to the offices using a chiller (cold water refrigeration system). The water requirement for the evaporator in each floor is 18.2 mh. The velocity within the pipe must remain between 1.5 m/s and 2.5 m/s, to ensure the appropriate heat exchange process in the evaporators and minimize the noise. The material of the pipe is...