Question

During your survey, there are 5 headway samples 5.6s, 8.2s, 7.3s, 8.1s, 11.8s collected on the...

During your survey, there are 5 headway samples 5.6s, 8.2s, 7.3s, 8.1s, 11.8s collected on the main road. Please count the number of vehicles that could enter into the main road from the minor road in these 5 headways. Assume there are unlimited queue in the minor road with critical gap 4.1s and follow up time 2.3s.

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
During your survey, there are 5 headway samples 5.6s, 8.2s, 7.3s, 8.1s, 11.8s collected on the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • D1. All over the world traffic increasing heavily on road, but the road capacity has to...

    D1. All over the world traffic increasing heavily on road, but the road capacity has to be increased to accommodate different types of vehicles. Huge finance needed to construct effective, durable, and safe road transport. Toll Finance is one of the techniques in which income collected from the users of the road for the transport service provided by them. The traffic tolls were created in a particular junction where it is needed. Lengthy queues could increase the travel time it...

  • Problem1 - At UW Medical Center, blood samples collected from patients at the hospital are sent...

    Problem1 - At UW Medical Center, blood samples collected from patients at the hospital are sent to a lab room for a test. Specimens arrive at the lab room at the rate of 20 an hour (Poisson). Currently there is only one technician who spends on average 2.4 minutes to process one specimen (Exponential). If a specimen cannot be processed immediately when it arrives, it will be stored in a temperature-controlled container inside the lab room. For simplicity assume that...

  • (15 points) Assume that all volumes shown have been converted to compatible through-car equivalent" values for...

    (15 points) Assume that all volumes shown have been converted to compatible through-car equivalent" values for the conditions shown. The phase plan in given in the following. Assume that critical volumes reverse in the other daily peak hour. The Saturation headway is 2 s/veh, start- up lost time is 1.5 s, clearance lost time is 2 s, Cycle length is 90s, only critical volumes shown and all volumes in tvu/h. Please determine: a. Find the appropriate number of lanes for...

  • just the extra credit part please Your customer needs an automated system to patrol the highways....

    just the extra credit part please Your customer needs an automated system to patrol the highways. The job of the system is to collect the following information on vehicles traveling down a certain stretch of highway: license plate number, current speed, and speed limit. A program is required to determine if a speeding ticket is needed for each set of data. Ticket will only be issued when number of miles per hours (mph) over the speed limit is at least...

  • ------------------------------------------------------------------------------------------------------------ CODE ALREADY HAVE BELOW--------------------------------------------------------------------------------------- public class LinkedQueue<T>

    ------------------------------------------------------------------------------------------------------------ CODE ALREADY HAVE BELOW--------------------------------------------------------------------------------------- public class LinkedQueue<T> implements QueueADT<T> {    private int count;    private LinearNode<T> head;    private LinearNode<T> tail;               public LinkedQueue()    {        count = 0;        head = null;        tail = null;    }    @Override    public void enqueue(T element)    {        LinearNode<T> node = new LinearNode<T> (element);        if(isEmpty())            head = node;        else           ...

  • Expand Your Critical Thinking 2-10 (Essay) At one time, Boeing dosed a giant deal of McDonnell...

    Expand Your Critical Thinking 2-10 (Essay) At one time, Boeing dosed a giant deal of McDonnell Douglas. to acquire another manufacturer, McDonnell Douglas. Boeing paid for the acquisition by issuing shares of its own stock to the stockho In order for the deal not to be revoked, the value of Boeing's stock could not dedine below a certain level for a number of months after the deal. During the first half of the year, Boeing suffered significant cost overruns because...

  • Please help ASAP please. Let X represent the full height of a certain species of tree....

    Please help ASAP please. Let X represent the full height of a certain species of tree. Assume that X has a normal probability distribution with mean 219.5 ft and standard deviation 62.5 ft You intend to measure a random sample of n 187 trees. The bell curve below represents the distibution of these sample means. The scale on the horizontal axis is the standard error of the sampling distribution Complete the indicated boxes, correct to two decimal places Points possible:...

  • Please help with my car traffic simulator! Code that I already have below, I do not know how to...

    Please help with my car traffic simulator! Code that I already have below, I do not know how to start it off! public class IntersectionSimulation { private final static int EAST_WEST_GREEN_TIME = 30 ; private final static int[] NORTH_SOUTH_GREEN_TIMES = { 20, 24, 30, 42 } ; private final static int[] CAR_INTERSECTION_RATES = { 3, 5, 10 } ; private final static int[] CAR_QUEUEING_RATES = { 5, 10, 30 } ; private final static int[] EXPERIMENT_DURATIONS = { 3*60, 5*60,...

  • can you please answer question 1 and 3 please ABC General Contractors ABC General Contractors was...

    can you please answer question 1 and 3 please ABC General Contractors ABC General Contractors was an established construction company handling small-to medium- sized commercial and industrial construction projects. Some recent projects that the company had completed were a 20,000-square-foot factory building, a four-story office building, and a water filtration plant. TELEVISION TOWER BID The company was now in the process of preparing a bid for a television station for the erection of a 225-foot-high television antenna tower and the...

  • Exercise 16-5 Your answer is partially correct. Try again. Following is the balance sheet of the...

    Exercise 16-5 Your answer is partially correct. Try again. Following is the balance sheet of the BDO Partnership: Cash $12,000 Liabilities $12,000 Accounts Receivable 41,000 Brink, Capital 47,000 Inventory 28,000 Davis, Capital 25,000 Equipment 58,000 Olsen, Capital 55,000 $139,000 $139,000 The partners share income 40:40:20, respectively. Assume that 70% of the receivables are collected and that inventory with a book value of $14,000 is sold for $10,000. All cash available at this time is to be distributed. Determine the proper...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT