Before doing anything, first, convert the speed into cycle time in minutes by using the following expression:

Cycle time = 60 / Speed in units per hr.

Product Assembly Polishing Packing
1 60/30 = 2 3 2
2 4 2 3
3 3 3 2
4 20/3 4 5

--------------------------------------------------

(a)

Let Xj = number of units of Product-j to be produced for j=1,2,3,4

Max Z = 1.5 X1 + 2.0 X2 + 3.45 X3 + 4.2 X4

Subject to,

2 X1 + 4 X2 + 3 X3 + (20/3) X4 <= 100000 (Assembly minutes)

3 X1 + 2 X2 + 3 X3 + 4 X4 <= 50000 (Polishing minutes)

2 X1 + 3 X2 + 2 X3 + 5 X4 <= 60000 (Packing minutes)

X1, X2, X3, X4 >= 0

(b)

In this case, the three constraints will be replaced just by the following single constraint:

2 X1 + 4 X2 + 3 X3 + (20/3) X4 + 3 X1 + 2 X2 + 3 X3 + 4 X4 + 2 X1 + 3 X2 + 2 X3 + 5 X4 <= 210000
or,
7 X1 + 9 X2 + 8 X3 + (47/3) X4 <= 210000

Add a comment
Know the answer?
Add Answer to:
Note that in this part you are only asked to model the problem. Do NOT try...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • (20 pts.) 2. As a supervisor of a production department, you s production totals of a...

    (20 pts.) 2. As a supervisor of a production department, you s production totals of a certain product that has two models, the deluxe and the special. The profit on the deluxe model is $12 per unit and the special's profit is $10 per unit. Each model goes through two phases in the production process, and there are only 100 man- hours available daily at the construction stage and only 80 man-hours available at the finishing and inspection stage. Each...

  • On the tab labeled "Original Problem", I have provided a problem statement and the modeling of...

    On the tab labeled "Original Problem", I have provided a problem statement and the modeling of a Linear Programming Model Problem. Carefully read the problem statement. Reference the Wyndor example from the text for an example of the integration of a linear model to Excel. The first requirement is to fill in the formulas in the GREEN cells for the Objective function and the constraints. There is no need to change the values in the RED cells. Next, open Solver...

  • As a supervisor of a production department, you must decide the daily production totals of a...

    As a supervisor of a production department, you must decide the daily production totals of a certain product that has two models, the Deluxe and the Special. The profit on the Deluxe model is $12 per unit, and the Special's profit is $10. Each model goes through two phases in the production process, and there are only 100 hours available daily at the construction stage and only 80 hours available at the finishing and inspection stage. Each Deluxe model requires...

  • Linear Programming Problem A manufacturer of three models of tote bag must determine the production plan...

    Linear Programming Problem A manufacturer of three models of tote bag must determine the production plan for the next quarter. The specifics for each model are shown in the following table. Model Revenue ($ per item) Cutting (hours per item) Sewing (hours per item) Packing (hours per item) A $8.75 .10 .05 .20 B $10.50 .15 .12 .20 C $11.50 .20 .18 .20 Time available in the three production departments are: Cutting 450 hours, Sewing 550 hours, Packing 450 hours....

  • 7.1) Billy Idell is trying to determine how many units of two types of lawn mowers to produce each day. One of the...

    7.1) Billy Idell is trying to determine how many units of two types of lawn mowers to produce each day. One of these is the Standard model, while the other is the Deluxe model. The profit per unit on the Standard model is $60, while the profit per unit on the Deluxe model is $40. The Standard model requires 20 minutes of assembly time, while the Deluxe model requires 35 minutes of assembly time. The Standard model requires 10 minutes...

  • please solve and and explain how it was done thank you C D E F G...

    please solve and and explain how it was done thank you C D E F G H I J K L Acme Shoe Company makes special-style shoes. It has a fixed cost of $1000 for production setup. The variable cost is $30 per pair and each pair sells for $40. 5 Known parameters: 6 Selling price per unit Fixed cost Variable cost per unit What is the breakeven revenue? 10 Input Data Number of units Is it possible to achieve...

  • Exercise 2 Linear Programming 1.         The Scrod Manufacturing Co. produces two key items – special-purpose Widgets...

    Exercise 2 Linear Programming 1.         The Scrod Manufacturing Co. produces two key items – special-purpose Widgets (W) and more generally useful Frami (F). Management wishes to determine that mix of W & F which will maximize total Profits (P). Data                                                                      W      F             Unit profit contributions                     $ 30   $ 20             Demand estimates (unit/week)               250      500             Average processing rates – each product requires processing on both machines (units/hour)                                     Machine #1                        2          4                                        Machine #2                ...

  • if you could only charge $18 for chairs, how is your optimal solution change? Variable Cells...

    if you could only charge $18 for chairs, how is your optimal solution change? Variable Cells Allowable Increase Name Decision Variables X1 Decision Variables X2 Decision Variables X3 Final Value 2.0 0.0 8.0 Reduced Objective Cost Coefficient 0.0 60.0 -5.0 30.0 0.0 20.0 Allowable Decrease 20.0 4.0 5.0 1000000000000000000000000000000.0 2.5 5.0 Constraints Allowable Decrease Name Lumber bdft) Total Finishing (hrs) Total Carpentry (hrs) Total Tables demand (hrs) Final Value 24.0 20.0 8.0 0.0 Shadow Constraint Allowable Price R.H Side Increase...

  • Model GG $140 12 Model TS Selling price $100 Direct materials Direct labor ($12 per hour)...

    Model GG $140 12 Model TS Selling price $100 Direct materials Direct labor ($12 per hour) 24 Variable support costs (S4 per machine-hour 8 Fixed support costs 20 Variable support costs are machine time at $4 per machine hour. Model AY $120 12 24 16 T 20 | T 48 1 6 20 Required: 1) Which model has the greatest contribution margin per unit? 2) Which model has the greatest contribution margin per machine-hour? 3) If the product mix is...

  • other options needed info QUESTION 10 If the profit per dozen changes to: Sweatshirt - F...

    other options needed info QUESTION 10 If the profit per dozen changes to: Sweatshirt - F profit = $85 Sweatshirt - B/F profit = $120 T-shirt - F profit = $40 T-shirt - B/F profit = $80 What happens with the LP model of this problem? Max Z-90x1125x2+45x3+66x4 subject to 85X1 + 120X2 + 40X3.BOX4 572 3X1 + 3X2 X3 X4 S 1200 36X1 +48X225x3 +35X4 S 25000 X1 + X2 X3 X4 S 500 X1 X2 X3 X40 Max...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT