Asphalt pavement may achieve temperatures as high as 50°C on a hot summer day. Assume that...
Asphalt pavement may achieve temperatures as high as 50oC on a hot summer day. Assume that such a temperature exists throughout the pavement, when suddenly a rainstorm reduces the surface temperature to 20oC. Calculate the magnitude of total amount of energy (kJ/m2) that will be transferred from the asphalt over a 30-min period in which the surface is maintained at 20oC. Consider density of asphalt as 2135 kg/m3 and thermal conductivity as 0.054000000000000006 W/mK. The specific heat capacity of asphalt...
Suppose it is a particularly hot summer day and you want to make some popsicles to help cool off. You fill a popsicle mold with 0.15kg of juice (suppose it is the same thermal energy as water). The juice starts out at a temperature of 30 °C and the freezer will cool it to -20 °C. a. How much heat must be removed from the popsicles in order to bring them to their final temperature. b. Draw an energy flow diagram...
I will rate. Thanks so much Supplemental Problem 2.003 A large plate of thickness 2L is at a uniform temperature of Tỉ-190°C, when it is suddenly quenched by dipping it in a liquid bath of temperature To Heat transfer to the liquid is characterized by the convection coefficient h. Assume x = 0 corresponds to the midplane of the wall -20°C (a) If h = 100 w/m2, K, what is the heat flux atx = L and t = 0?...
A 12-ounce soft drink weighs about 0.35 kilograms. Assume that on a hot day a can of soft drink is cooled in a container of liquid water in equilibrium with ice. There is enough ice in the container so that the temperature of the ice water stays constant at 0 0 C and the ice-water can be considered a heat sink. Model the soft drink with the properties of water, assuming it has an initial temperature of 30 0 C...
summatize the following info and break them into differeng key points. write them in yojr own words apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...
summarizr the followung info and write them in your own words and break them into different key points. 6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...