Steel Company manufactures two kinds of wrought-iron rails: Model \(\mathrm{E}\) (the elegant) and Model D (the distinctive). Model E rails sell for \(\$ 59\) and cost \(\$ 50\) to make, whereas Model D rails sell for \(\$ 48\) and cost \(\$ 41\) to make. To make one Model \(E\) rail requires 2 hours on Machine \(A, 1\) hour on Machine \(B,\) and 4 hours on Machine \(C\). On the other hand, to make one Model \(D\) rail requires 1 hour on \(A, 2\) hours on \(B,\) and 5 hours on C. Production scheduling indicates that during the coming week Machine A will be available for at most
30 hours, Machine \(\mathrm{B}\) for at most 24 hours, and Machine \(\mathrm{C}\) for at most 72 hours. Find the number of each kind of rail to be made in the coming week in order for the company to maximize its profit. Calculate the maximum profit.
We need at least 9 more requests to produce the answer.
1 / 10 have requested this problem solution
The more requests, the faster the answer.
I just need the answers fo b, c, d A firm uses three machines in the manufacture of three products. Each unit of product I requires 3 hours on machine 1, 2 hours on machine 2, and I hour on machine 3. Each unit of product:2 requires product 3 requires 2 hours on machine 1, 2 hours on machine 2, and 2 hours on machine 3. The contribution margin of the three products is $30, $40, and $35 per unit,...
The Pine Furniture Company makes fine country furniture. The company’s current product lines consist of end tables, coffee tables, and dining room tables. The production of each of these ta- bles requires 8, 15, and 80 pounds of pine wood, respectively. The tables are handmade, and require one hour, two hours, and four hours, respectively. Each table sold generates $50, $100, and $220 profit, respectively. The company has 3,000 pounds of pine wood and 200 hours of labor available for...
how to solve this of fans is now 170? Can we speculate the new profit value 9. If the number of cooling coils is now 420, what is the new profic? Bags Production problem ht Hand Side easibility) A manufacturer produces 3 models of bags: A, B and C. Constraints limitations (time available in minutes) in each of the 3 There is also one more constraint that requires the m A. The linear programmin production capacity Cutting, Sewing, and Packaging...
Use the scenario given below to answer the following question(s) Ray Inc. manufactures two types of gaming consoles, the sp2 hybrid and the sp3 hybrid models. The manufacturing process consists of two principal departments: design and production. The design department has 58 skilled workers, each of whom works 7 hours per day. The production department has 25 workers, who also work a 7-hour shift. On an average, to produce a sp2 hybrid, Ray Inc. requires 3.5 labor hours for design...
solve all of this please Question #2 (5 points) Bardo, Inc. produces three products. Data concerning the selling prices and variable costs of the three products, along with the amount of milling time needed to produce a unit, appear below: Product Selling price Variable costs Milling machine time (hours) $ 50 $ 40 $ $ 80 50 $ $ 70 55 Demand for the three products exceeds the company's productive capacity. The milling machine is the constraint, with only 2,400...
please solve this question Question #2 (5 points) Bardo, Inc. produces three products. Data concerning the selling prices and variable costs of the three products, along with the amount of milling time needed to produce a unit, appear below: Product G Selling price $ 80 $ 70 Variable costs $ 50 $ 55 Milling machine time (hours) 5 Demand for the three products exceeds the company's productive capacity. The milling machine is the constraint, with only 2,400 hours of milling...
Use Excel/Solver add in for accurate answers. Problem 3-19 (Algorithmic) Better Products, Inc., manufactures three products on two machines. In a typical week, 40 hours are available on each machine. The profit contribution and production time in hours per unit are as follows: Category Product 1 Product 2 Product 3 Profit/unit $39 $51 $18 Machine 1 time/unit 1.5 Machine 2 time/unit Two operators are required for machine 1; thus, 2 hours of labor must be scheduled for each hour of...
2 Jackson Hole Manufacturing Jackson Hole Manufacturing is a small manufacturer of plastic products used in the automotive and computer industries. One of its major contracts is with a large computer company and involves the 2 production of plastic printer cases for the computer companys portable printers. The printer cases are produced on two injection molding machines. The M-100 machine has a production capacity of 25 printer cases per hour, and the M-200 machine has a production capacity of 40...
PC-Express is a computer retail store that sells two kinds of microcomputers: desktops and laptops. The company earns $700 profit on each desktop computer it sells and $900 profit on each laptop. The microcomputers PC-Express sells are from its wholesaler. This wholesaler can only supply PC-Express up to 60 desktops and 75 laptops next month. The employees at PC-Express must spend 2 hours installing software and checking each desktop computer they sell. The employees spend 3 hours to complete this...
Aria’s Juice Bar can sell all the units it can produce of either apple juice or orange juice but not both. Apple juice has a unit contribution margin of $45 and takes three machine hours to make and orange juice has a unit contribution margin of $32 and takes two machine hours to make. There are 1,300 machine hours available to manufacture a product. What should Aria’s Juice Bar do? Select one: a. Make apple juice which creates $13 more...