Borges Machine Shop, Inc., has a 1-year contract for the production of 225 comma 000225,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They aregeneral-purpose equipment (GPE), flexible manufacturing system(FMS), and expensive, but efficient, dedicated machine (DM).
The cost data follow:
General-Purpose Equipment (GPE)
Flexible Manufacturing System (FMS)
Dedicated Machine (DM)
Annual contracted units
225 comma 000225,000
225 comma 000225,000
225 comma 000225,000
Annual fixed cost
$ 125 comma 000$125,000
$ 250 comma 000$250,000
$ 525 comma 000$525,000
Per unit variable cost
$ 18.00$18.00
$ 14.00$14.00
$ 13.00$13.00
The option GPE is best when the contracted volume is below ___ units.
The option FMS is best when the contracted volume is between ___ and ___ units.
The option DM is best when the contracted volume is over ____ units.
Total cost = fixed cost + variable cost per unit * volume
For GPE is to be the best:
The cost of GPE is to be less than the other two
Let the volume be x
Cost of GPE = 125000 + 18*x
Cost of FMS = 250000 + 14*x
Cost of DM = 525000 + 13*x
So,
125000 + 18*x <= 525000 + 13*x
5*x <= 400000
x <= 400000/5 = 80000
125000 + 18*x <= 250000 + 14*x
x <= 31250
Answer is: below 31250 (as 31250 < 80000)
For FMS to be the best:
Let the volume be x
Cost of GPE = 125000 + 18*x
Cost of FMS = 250000 + 14*x
Cost of DM = 525000 + 13*x
250000 + 14*x <= 125000 + 18*x
x >= 31250
250000 + 14*x <= 525000 + 13*x
x <= 275000
Answer is: between 31250 and 275000
DM is best:
125000 + 18*x >= 500000 + 13*x
5*x >= 400000
x >= 80000
250000 + 14*x >= 525000 + 13*x
x >= 275000
Answer is: above 275000
********
IF YOU HAVE ANY DOUBT, KINDLY COMMENT. I WOULD LOVE TO HELP YOU!!!
IF YOU LIKE THE ANSWER, PLEASE GIVE AN UP-VOTE OR THUMB UP. THIS WILL ENCOURAGE ME TO ANSWER MORE!!
Borges Machine Shop, Inc., has a 1-year contract for the production of 225 comma 000225,000 gear...
Borges Machine Shop, Inc., has a 1-year contract for the production of 200 comma 000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 200 comma 000 ...
Borges Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 200 comma 000200,000 200...
Borges Machine Shop, Inc., has a 1-year contract for the production of 225.000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DML The cost data follow: Annual contracted units Annual fixed cost Per unit variable cost General Purpose Equipment (GPE) 225,000 $150,000 $18.00 Flexible...
Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 250,000 250,000 250,000 Annual...
Borges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow. Annual contracted units Annual foxed cost Per unit variable cost General-Purpose Equipment (GPE) 75,000 $100,000 $15.00 Flexible Manufacturing...
Borges Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: GPE FMS DM Annual Contracted Units $200,000 $200,000 $200,000 Annual Fixed Cost $100,000 $200,000 $500,000 Per unit variable...
Can someone please help? Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow Annual contracted units Annual fixed cost Per unit variable cost General-Purpose Equipment (GPE) 250,000...
Juryo mume Hop, Inc. has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Luis Bor extended and the volume increased next year Borges has developed costs for three alternatives. They are general-purpose equipment (G system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow Annual contracted units Annual foxed cost Per unit variable cost General Purpose Equipment (GPE) 200.000 $150,000 $15.00 Flexible Manufacturing System (FMS) 200,000 $225,000 $14.00 Dedicated...
Borg Machine Shootine has a 1-year contract for the production of 200,000 or housings for a new road vehicle Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (OPE), fexible manufacturing system (FMS) and expensive, but elicient, dedicated machine The cost data flow Flexible Manufacturing System (FMS) General Purpose Equipment (GPE) 200.000 $150 000 $18.00 Dedicated Machine (OM) 200.000 $480.000 Arvus contracted units...
Meile Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Larry Meile hopes the contract will be extended and the volume increased next year. Meile has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS) LOADING... , and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 250,000 250,000 250,000 ...