Question
hi can you help me solve this foundation design question? I will rate well thank you!
a. A 0.5 meter diameter, 10 meters long , concrete pile is driven into a sandy soil stratum. Groundwater is located 3 m below
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Both sections are done.

Necessary equations are specified in the solution.

Solution is uploaded below.factors ). aq (qz ou xNq) [Neglecting all other minor a= bearing stressay in kN/m2 Tuz effective vertical pressure at tipi -CA)YO - 110 lbs/et3. & sat = Obrow el10+ 62.4 = 172.4 lb/ft3 Q2 250 kipse 250x103 lb 250x103 12 = 124340.8 en 1 lb/et? 61.6) 2A)996.488 KN is the ultimate bearing capacity of the pile.

B)Df=37.91 ft is the required length of same pile to have a ultimate bearing capacity of 250 kips.

Add a comment
Know the answer?
Add Answer to:
hi can you help me solve this foundation design question? I will rate well thank you!...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Help please! Problem 3 A prefabricated concrete pile is to be driven into a dense sand...

    Help please! Problem 3 A prefabricated concrete pile is to be driven into a dense sand deposit as shown in Figure 3 Determine the following; 1. Ultimate bearing capacity of the pile using Meyerhof and NORDLUND method. 2. Using Driven sofiware, calculate the capacity of the pile. (Attach report from the software). 3. At this same soil profile, compare the ultimate capacity of different piles (high displacement and low displacement) and comment based on your results. You should present the...

  • 7. Pile cap foundation design A pile cap foundation systems is a thick concrete mat that rests on...

    7. Pile cap foundation design A pile cap foundation systems is a thick concrete mat that rests on concrete or timber piles that have been driven into soft or unstable ground to provide a stable foundation for bridge piers as shown in the figure below In this example, each bridge pier is built on piles with length of 15 m and diameter of 0.5 m. The modulus of elasticity of the pile is 6890 MPa. The soil provides a frictional...

  • please show step by step (also show how to find the vertical stress increase) 18 A...

    please show step by step (also show how to find the vertical stress increase) 18 A new petroleum storage tank is proposed at an oil refinery to be supported by a 20-meter diameter slab foundation at the ground surface. The structure will produce a uniform load of 110 kN/m2 on the entire slab foundation. A subsurface investigation has revealed the shown soil profile. A series of laboratory tests on representative samples obtained from the clay stratum has resulted in the...

  • help with problems 1 & 2 please and explain Problem 1 A deposit of Swedish clay...

    help with problems 1 & 2 please and explain Problem 1 A deposit of Swedish clay is 15 m thick drained at both top and bottom. The coefficient of consolidation for the clay layer was estimated to be 1 x 10 cm/sec from laboratory test. The ultimate consolidation settlement (Sc) was calculated under the applied load in the field and was found 80 cm. Find the following: a) How long would it take for settlement of 40 cm and 70...

  • Q1 (10 marks) You have been asked to examine the bearing capacity of several different rectangular...

    Q1 (10 marks) You have been asked to examine the bearing capacity of several different rectangular pad footings. The width of each of the footings is to remain constant wil vary. In order to reduce the number of calculations, you have decided to plot the ultimate bearing capacity against the length of the footing. The properties of the underlying soil profile are given in Table 1.1. The base of the footing is to be located 1 m below ground level...

  • Question 2 [Marks: 15 +10=25] 200kPa of construction stress was applied on top of the soil...

    Question 2 [Marks: 15 +10=25] 200kPa of construction stress was applied on top of the soil layers as shown in the figure below. (1) Calculate the settlement in the clay layer due to the construction (minimum of 2 sub layers is to be used). (W) If the soil went through 90% average degree of consolidation in 1 year, calculate the coefficient of consolidation (C.). 个 Sand Y = 20kN/m 4m Water table Clay (over consolidated) y = 16kN/m 100 4m...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT