The owner of Bubba’s Barbeque is trying to determine a standard time for assembling each kind of sandwiches he sells. During a time study for assembling Bubba’s Famous Pulled Pork Sandwiches you recorded the following data in seconds.
Work Element | Cycles | Performance Rating | ||||
1 | 2 | 3 | 4 | 5 | ||
Prepare hoagie roll, move to prep area, open roll. | 31 | 26 | 33 | 34 | 31 | 105% |
Get pork from smoker. | 26 | 19 | 25 | 26 | 19 | 95% |
Shred pork for sandwich | 149 | 148 | 145 | 140 | 141 | 100% |
Place pork on roll. | 6 | 5 | 6 | 6 | 7 | 103% |
Pour on special BBQ sauce. | 10 | 12 | 11 | 12 | 10 | 110% |
Close hoagie roll, slice in half. | 15 | 17 | 16 | 18 | 14 | 105% |
Wrap sandwich, place in pickup area. | 20 | 19 | 21 | 22 | 18 | 108% |
Allowances per 8-hour shift | |
Change into uniform | 11 minutes |
Unavoidable delays | 3 minutes |
Break | 10 minutes |
Lunch | 25 minutes |
Change out of uniform | 11 minutes |
Total | 60 minutes |
a. Compute the normal time for each element (Nt). Based on that information, what is the job's NT. (Round your answer to two decimals.)
b. Compute the allowance factor (for the workday/time
worked) based on the allowance information
provided. % (Round your answer to one decimal. Do
not include the % sign on your answer.)
c. Compute standard time for the
job. (Round your answer to two decimals.)
d. If the owner expects demand for Bubba’s Famous
Pulled Pork Sandwiches to be 105 per hour, how many employees
should be assigned to prepare this kind of
sandwich?
a.
Formula
b.
Allowance factor = (60/480)*100 = 12.5%
c.
Standard time = total normal time/(1-allowance factor)
=255.68/(1-12.5%) = 292.2057143 = 292.21 seconds (Rounded to 2 decimal places)
d.No of employees required = 105/(3600/292.2057143) =
8.522666667 = 9 (Rounded to nearest whole number)