Question

6. (Answer must include the procedure of how to find feasibility region and a vertex point). (pts) A manufacturer produces tw
0 0
Add a comment Improve this question Transcribed image text
Answer #1

WtNr A H and Blyo pofitZ: 25115y Nuv ASSmblir 5x +4 20D tainty 21 3y 108 5 +4y -200 o +3y -1080 0150 (41-108)+3*200 2(-20) 5l

Add a comment
Know the answer?
Add Answer to:
6. (Answer must include the procedure of how to find feasibility region and a vertex point)....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • he Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires...

    he Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 3 hours to assemble and 1 2 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 24 per day, and the maximum number of painting hours available is 8 per day. If the profit on the deluxe model is $90 per unit and the profit on the economy...

  • A small company manufactures three different electronic components for computers. Component A req...

    A small company manufactures three different electronic components for computers. Component A requires 2 hours of fabrication and 1 hour of assembly; component B requires 3 hours of fabrication and 1 hour of assembly, and component C requires 2 hours of fabrication and 2 hours of assembly. The company has up to 950 labor-hours of fabrication time and 700 labor-hours of assembly time available per week. The profit on each component, A, B, and C, is $7, $8, and $10,...

  • Linear Programming Assignment You must do the necessary calculations in the answer cells. Simply providing a...

    Linear Programming Assignment You must do the necessary calculations in the answer cells. Simply providing a number in the answer cell will not receive any credit. Problem 1: Use the information below to complete the assignment van Oploo’s motor cycle company makes two motor cycles. The model "E" has a new engine and a low profile. Model "L" is larger, it uses an older engine and is specifically designed to appeal to women. van Oploo's produces the engines for both...

  • Use the scenario given below to answer the following question(s) Ray Inc. manufactures two types of...

    Use the scenario given below to answer the following question(s) Ray Inc. manufactures two types of gaming consoles, the sp2 hybrid and the sp3 hybrid models. The manufacturing process consists of two principal departments: design and production. The design department has 58 skilled workers, each of whom works 7 hours per day. The production department has 25 workers, who also work a 7-hour shift. On an average, to produce a sp2 hybrid, Ray Inc. requires 3.5 labor hours for design...

  • Please check Answers: (1) The constrained optimization problem is written as: Maximize $300B + $500D Subject...

    Please check Answers: (1) The constrained optimization problem is written as: Maximize $300B + $500D Subject to the constraints                 Grinding hours: 2B + 5D ≤ 800        Drilling hours: 3B + 2D ≤ 400        Polishing hours: 2B + 4D ≤ 480 Loose constraint is grinding hours. 800 – 560 = 240 hours 1. Ralph Inc. manufactures two different models of product: basic and deluxe. The miniature tables and chairs provide $300 and $500 of contribution margin, respectively....

  • This is a TYPE 1 Problem - Use a blank piece of paper for this problem...no...

    This is a TYPE 1 Problem - Use a blank piece of paper for this problem...no other problems should be on that page. You will not get feedback about whether or not it is correct when you submit your result below. You do NOT have to copy the problem at the top. The Wellbuilt Company manufactures two types of wood chippers, economy and deluxe. Each economy chipper requires 3 hours to assemble, 2 hours to paint, and results in $30...

  • its in hours 2. A manufacturer of vacuum cleaners produces three models of canister-style vacuum cleaners-the...

    its in hours 2. A manufacturer of vacuum cleaners produces three models of canister-style vacuum cleaners-the X-100, X-200, and X-300-on a production line with three stations-motor assembly, final assembly, and test. The line is highly automated and is run by three operators, one for each station. Data on production times, material cost, sales price, and bounds on demand are given in the following tables: Product Material Cost ($/Unit) Price $/Unit) Minimum Demand Maximum Demand (Units per Month) (Units per Month)...

  • how to solve this of fans is now 170? Can we speculate the new profit value...

    how to solve this of fans is now 170? Can we speculate the new profit value 9. If the number of cooling coils is now 420, what is the new profic? Bags Production problem ht Hand Side easibility) A manufacturer produces 3 models of bags: A, B and C. Constraints limitations (time available in minutes) in each of the 3 There is also one more constraint that requires the m A. The linear programmin production capacity Cutting, Sewing, and Packaging...

  • Q4: 3 marks A manufacturer has three machines I, Il and Il installed in his factory....

    Q4: 3 marks A manufacturer has three machines I, Il and Il installed in his factory. Machines I and Il are capable of being operated for at most 12 hours whereas machine III must be operated for at least 5 hours a day. She produces only two items M and N each requiring the use of all the three machines. The number of hours required for producing 1 unit of each of M and N on the three machines are...

  • Use the simplex method to solve the linear programming problem. Maximize z = xy + 3x2...

    Use the simplex method to solve the linear programming problem. Maximize z = xy + 3x2 + x3 + 9x4 subject to Xy+ 7x2 + x3 + X4 5 10 8xy + x2 + 4x3 + X4 180 Xy 20,X220, X3 20,X420 Select the correct choice below and, if necessary, fill in the answer boxes to complete your choice. O A. The maximum is when xy = X2 s, -and s2 = B. There is no maximum. The initial simplex...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT