Problem 10-31

AQL = 20%

LTPD = 52%

LTPD/AQL = 52%/20% = 2.6

Look for the value closest to 2.6 in the second column of the following table

Exhibit 10.16

Sampling Plan Table with Producers Risk = 0.05 and Consumers Risk = 0.10

C LTPD/AQL n(AQL) n(LTPD)
0 44.89 0.052 2.334
1 10.946 0.355 3.886
2 6.509 0.818 5.324
3 4.89 1.366 6.68
4 4.057 1.97 7.992
5 3.549 2.613 9.274
6 3.206 3.286 10.535
7 2.957 3.981 11.772
8 2.768 4.695 12.996
9 2.618 5.426 14.205

The value closest to 2.6 is 2.618

and the corresponding value of c is 9 and value of n(AQL) is 5.426

where, c is the acceptance number

and n is the sample size. Therefore,

n = n(AQL)/AQL = 5.426/20% = 27

a)

Sample size =  27

b)

Randomly select LSI using the sample size from part a,   Reject   the lot if more than   9   defectives.

Add a comment
Know the answer?
Add Answer to:
Problem 10-31 (Algo) Large-scale integrated (LSI) circuit chips are made in one department of an electronics...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • I need help with number 8 and 9. Thanks in advance. Questions 6-10 are related to...

    I need help with number 8 and 9. Thanks in advance. Questions 6-10 are related to the following As a statistics course assignment you are to build a 95% confidence interval for the mean monthly rental for two-bedroom apartments in Marion County. A random sample of 80 apartments yields the following data. 670 1260 640 930 400 1440 1080 1230 960 870 970 740 1030 930 1420 1120 1270 940 1210 730 1040 1340 1100 1290 1040 700 1310 630...

  • Forecasting method

    Use the moving average method to forecast period 105.Use the exponential smoothing method to forecast period 105.Use the time-series decomposition method to forecast period 105.Comparing the three methods, which one fits this situation best?The larger the parameter (n) is set, the more historical data are taken into account by the moving average.You can choose different parameter (n) to extrapolate to compare the prediction effect.In general, the parameter (n) should not be taken too large.Moving average.153025703560453055106560761085609580106101165012700136701470015760167301776018820197802090021840227702382024800257602676027770287902976030740317203267033690344703567036690376203865039610406204164042590436104460045630466004763048640496105059051610526305366054640558105679057820586505971060700616706269063730647306576066790678106887069890708707189072880739307498075900768607789078880798708084081860829108387084860858408654087780887508978090760917109273093750947509571096750977209877099740100750101760102780103800104850105Exponential smoothingsame153025703560453055106560761085609580106101165012700136701470015760167301776018820197802090021840227702382024800257602676027770287902976030740317203267033690344703567036690376203865039610406204164042590436104460045630466004763048640496105059051610526305366054640558105679057820586505971060700616706269063730647306576066790678106887069890708707189072880739307498075900768607789078880798708084081860829108387084860858408654087780887508978090760917109273093750947509571096750977209877099740100750101760102780103800104850105Time-series decomposition153025703560453055106560761085609580106101165012700136701470015760167301776018820197802090021840227702382024800257602676027770287902976030740317203267033690344703567036690376203865039610406204164042590436104460045630466004763048640496105059051610526305366054640558105679057820586505971060700616706269063730647306576066790678106887069890708707189072880739307498075900768607789078880798708084081860829108387084860858408654087780887508978090760917109273093750947509571096750977209877099740100750101760102780103800104850105

  • Please design a clipper circuit that produces voltage as shown. You may the standard value pf...

    Please design a clipper circuit that produces voltage as shown. You may the standard value pf resistor as guidlines ASSIGNMENT BEE2213 19201 QUESTION 2 Design a clipper circuit that produces voltage output as shown in the Figure 1. Vi 15V N ? Vi Vo Vo 5V Figure 1 @ 43% .. MY MAXIS 4G 14:38 Done Assignment_Guideline_2130afeo... 2 RSG FREE BEE2213/192011 APPENDIX 1- Standard Value Resistors Standard Values of Commercially Available Resistors Ohms (0) Kilo Ohms (KO) Mega Ohms (MO)...

  • Can somone show me how to do the 1st problem? Need to find the LS and...

    Can somone show me how to do the 1st problem? Need to find the LS and SS for the fit and the LH and SH for the hole. Fits are all SHAFT BASIS METRIC but the shaft and hole diameters can not be used right out of the table. This is because the 3mm shaft tolerance does not match. You will need to lookup the "Fit" from the table, and then use the LS (Largest Shaft) and SS (Smallest Shaft)...

  • QUESTION 21 Q21 (LO3) (2 Marks] A tank whose volume is unknown is divided into two parts by a parttion. One side of the tank contains 0.05 m3 of refrigerant-134a that is a saturated liqui at 0.9...

    QUESTION 21 Q21 (LO3) (2 Marks] A tank whose volume is unknown is divided into two parts by a parttion. One side of the tank contains 0.05 m3 of refrigerant-134a that is a saturated liqui at 0.9 MPa, while the other side is evacuated. The partion is now removed, and the refrigerant i determine the volume of the tank fils the entire tank. If the final state of the refrigerant is 20°C and 280 kPa, R-134a Evacuated P 0.9 MPa...

  • In C++ Programming: Using a single for loop, output the even numbers between 2 and 1004...

    In C++ Programming: Using a single for loop, output the even numbers between 2 and 1004 (inclusive) that iterates (loops) exactly 502 times. The outputted numbers be aligned in a table with 10 numbers per row. Each column in the table should be 5 characters wide. Do not nest a loop inside of another loop. Hint: First create and test the code that output the numbers all on one line (the command line will automatically wrap the output to new...

  • Problem 4. A section of a two-lane highway has 12-ft lanes and a design speed of...

    Problem 4. A section of a two-lane highway has 12-ft lanes and a design speed of 75 mi/h. The section contains a vertical curve and a horizontal curve. The vertical curve connects a-2.5% grade and a +1.5% grade. The PVT of this vertical curve is at station 36 + 50. The PC of the horizontal curve is located 294 ft before the PVC of the vertical curve. The horizontal curve has superelevation of 8% and central angle of 38 degrees....

  • please complete all 4 required parts Problem 5-10 (Algo) Solving for unknowns; installment notes (LO5-9) 10...

    please complete all 4 required parts Problem 5-10 (Algo) Solving for unknowns; installment notes (LO5-9) 10 points Lowlife Company defaulted on a $300,000 loan that was due on December 31, 2021. The bank has agreed to allow Lowlife to repay the $300,000 by making a series of equal annual payments beginning on December 31, 2022 (FV of $1. PV of $1. EVA of $1. PVA of $1. EVAD of 51 and PVAD OTS1) (Use appropriate factor(s) from the tables provided.)...

  • 174 2 combustor , =1500 K Problem 2 (22 pts): Brayton cycle and entropy calculations An...

    174 2 combustor , =1500 K Problem 2 (22 pts): Brayton cycle and entropy calculations An open Brayton cycle is used to generate electricity. Air enters the isentropic compressor at T1 = 300 K and P1 = 100 kPa with a mass flow rate m = 1.5 kg/s. The combustor can be modeled as a constant-pressure heat exchanger, supplying 1540 kW of thermal power to the air from a thermal reservoir (Th = 1750 K). Air enters the isentropic turbine...

  • Question Help regarding the new mache o e Heavenly Candy Company is considering purchasing a second...

    Question Help regarding the new mache o e Heavenly Candy Company is considering purchasing a second chocolate dipping machine in order to expand their business. The information Heavenly has com BB Cack the icon to view the information) Present Value of $1 table Present Value of Annuity of $1 table Future Value of $1 table Future Value of Anuty of table Read the requirements Requirement 1. Calculate the following for the new machine: a. Net present value (NPV) (Use factors...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT