9.10 For each of the stated conditions, determine the probable production expressed in cubic yards per...
9.5 A shovel having a 5-cy bucket whose cost per hour, including the wages to an operator, is $96 will excavate well-blasted rock and load haul units under each of the stated conditions. The maximum digging height of the machine is 35 ft. Determine the cost per cubic yard for each condition Condition Height of excavation (ft) Angle of swing (degrees) Efficiency factor (min per hr45 10 60 18 90 40 24 120 30 28 150 45
Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem 1: A crawler hoe having a 2 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for each condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy;...