We need at least 10 more requests to produce the answer.
0 / 10 have requested this problem solution
The more requests, the faster the answer.
Please make it with a clear line . The plan and sectional elevation of reinforce isolated...
i have also attached the solutions. could you please explain step by step what they are doing. especially the bit in part (a) where they do x/d Question 2 Picture it. It's 5 o'clock on Friday and at the end of a long week all Dave wants to do is go home. But his boss has other ideas; he tells Dave that he can go once he has designed the tension reinforcement for the beam in Figure 2. a) Design...
"Annexure B" ASSIGNMENT 2 DESIGN BRIEF Due to increasing pedestrian traffic of students travelling from halls of residence to the engineering block at one of its devised a plan, which includes a new means of crossing a busy road safely and without causing traffic delay. A solution to protect student safety for crossing the busy road is to design and build a pedestrian bridge. This will eliminate traffic congestion and delays as well as eliminate conflict between pedestrians and motorists....