The production function for homes is given by:
Q = 5KL
Where Q = output of homes per week
K = capital
L = work teams
a. Assuming capital is fixed at K=5, how many labor teams does the firm need to hire if it wants to produce 100 homes ?
b. If each labor team costs $500 and capital costs $100 per unit, how much will it cost them to produce 100 homes?
c. If there are no work teams available, how many homes can be built?
We need at least 10 more requests to produce the answer.
0 / 10 have requested this problem solution
The more requests, the faster the answer.
The production function for homes is given by: Q = 5KL Where Q = output of...
Imagine that the production function for tuna cans is given by q=6K+4L where q = Output of tuna cans per hour. K = Capital input per hour L = Labor input per hour a) Assuming capital is fixed a K = 6, how much L is required to produce 60 tuna cans per hour? To produce 100 per hour? b) Now assume that capital input is fixed at K = 8 what L is required to produce 60 tuna cans...
The production function of the Auto parts firm is given by Q-5L-L, where Q is the units of output and L is the number of labor hours. Each output sells for 100 dollars per unit. The human resources manager estimates that the marginal cost of hiring an extra worker is 50 dollars. How many labor hours should this firm hire? Hint: MPL=5-2 L 1) 2) A frim's production function is given by Q(L)-6L, where Q measures output and L is...
17) We manufacturer automobiles given the production function q = 5KL where q is the number of autos assembled per eight-hour shift, K is the number of robots used on the assembly line (capital) and L is the number of workers hired per hour (labor). If we use K = 10 robots and L = 10 workers in order to produce q = 450 autos per shift, then we know that production is: A) technologically efficient. B) technologically inefficient. C)...
A firm has the following production function Q= √KL Where Q is output per week and K and L are units of capital and labor per week. If rental price of capital v= 100 per week and the wages w = 400 per week obtain the quantity of K and L that min the cost for Q = 10.
A company produces car engines with the following technology: Q=5KL where K denotes the number of conveyor belts and L denotes the number of working teams. The rent for one conveyor belt is 10000 per week and one team of workers costs 5000 per week. Additionally, each engine requires materials costing 2000. Imagine that the number of conveyor belts is fixed to five in the short-run What is the average short-run production cost of one engine, when total output equals...
A production function is given as Q = 21L - 0.06L2. If each unit of output Q contributes $10 in revenue (sells for $10) and each labor unit costs $42 per hour, how many units of labor (L) should be hired to maximize profit? Given your answer to part c, what output (Q) will the firm produce? Assuming no other cost than labor costs, what is the profit at this level of labor and output Suppose that the marginal...
A company produces car engines with the following technology: Q=5KL where K denotes the number of conveyor belts and L denotes the number of working teams. The rent for one conveyor belt is 10000 per week and one team of workers costs 5000 per week. Additionally, each engine requires materials costing 2000. Imagine that the number of conveyor belts is fixed to five in the short-run Which equation denotes the short-run total cost of producing Q engines? Wählen Sie eine...
A firm has a production function of Q=20K^.2*L^.8 where Q measures output, K represents machine hours, and L measures labor hours. If the rental cost of capital (r) equals $15 the wage rate (w) equals $10, and the firm wants to produce 40,000 units of output, how much labor and capital should the firm use?
You manage a plant that mass-produces engines by teams of workers using assembly machines. The technology is summarized by the production function qequals=2020KL where q is the number of engines per week, K is the number of assembly machines, and L is the number of labor teams. Each assembly machine rents for requals=$50 comma 00050,000 per week, and each team costs wequals=$4 comma 0004,000 per week. Engine costs are given by the cost of labor teams and machines, plus $5...
Imagine that your firm has a production function given by Q = 2 KL, where K is capital and L is labor. If capital rents for $100 per unit per day, labor can be hired for $200 per unit per day, and the firm is minimizing costs, a. What is the total cost of producing q units of output? b. What is the average cost of producing q units of output? c. What is the marginal of producing q units...