QUESTION 3 (20 marks) A. Following are the results of a standard penetration test in sand. Determine the corrected standard p

Can anyone solve this Geotechnical Engineering question.... I will leave good remarks ??

0 0
Add a comment Improve this question Transcribed image text
Answer #1

unit 3 weight of sand = 11016/ft 3 weight of water = 62.4 lb/ft 3 Depth N60 5 8 10 Z 15 13 20 15 25 12 At d = 50 ft o overbunI Lege دهم (8) o. 4800 con N60 At d = isft 10XLS - 62.4x15 2000 con 0.47 logio tour (N16) 60 = 30-344 0.3zaxis 5.16 # = الى 2

Add a comment
Know the answer?
Add Answer to:
Can anyone solve this Geotechnical Engineering question.... I will leave good remarks ?? QUESTION 3 (20...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 3. A soil boring was drilled in a multi-layered deposit, as shown in the boring log...

    3. A soil boring was drilled in a multi-layered deposit, as shown in the boring log below. A SPT was also performed at intervals of 1 m. A donut hammer and a liner sampler were used. Care was taken to connect the rod segments firmly and to follow standard procedure. a. Find the corrected Noo at the depths of 9 and 27 feet. b. What is the (N;) at the depth of 13 feet? c. Estimate the drained friction angle...

  • PLEASE FILL IN THE TABLE AND SHOW SAMPLE CALCULATIONS, thank you(: 3. In order to support...

    PLEASE FILL IN THE TABLE AND SHOW SAMPLE CALCULATIONS, thank you(: 3. In order to support a structural load of q 500 kPa, a raft B1 B2 measuring 12.2 m x 24.4 m in plan, is to be founded on detected at the depth of 10.0m. Five boreholes have been24.4m drilled on-site and SPT tests have been carried out at the depths shown. Water table is at 2.0 m. » B3 B4. a) Determine the minimum depth of required 12.2m...

  • Question 2 [Marks: 15 +10=25] 200kPa of construction stress was applied on top of the soil...

    Question 2 [Marks: 15 +10=25] 200kPa of construction stress was applied on top of the soil layers as shown in the figure below. (1) Calculate the settlement in the clay layer due to the construction (minimum of 2 sub layers is to be used). (W) If the soil went through 90% average degree of consolidation in 1 year, calculate the coefficient of consolidation (C.). 个 Sand Y = 20kN/m 4m Water table Clay (over consolidated) y = 16kN/m 100 4m...

  • Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem...

    Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem 1: A crawler hoe having a 2 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for each condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy;...

  • can you please answer question 1 and 3 please ABC General Contractors ABC General Contractors was...

    can you please answer question 1 and 3 please ABC General Contractors ABC General Contractors was an established construction company handling small-to medium- sized commercial and industrial construction projects. Some recent projects that the company had completed were a 20,000-square-foot factory building, a four-story office building, and a water filtration plant. TELEVISION TOWER BID The company was now in the process of preparing a bid for a television station for the erection of a 225-foot-high television antenna tower and the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT