a)
The precedence diagram is shown below.
b)
The demand = 3000
Total available time = 40*50 = 2400
Cycle time = available time / demand = 2400/3000 = 0.8 min
c)
The total task time = 2.1 minutes
Cycle time = 0.8 minutes
Theoretical number of workstation = 2.1/0.8 = 2.625
Rounding up, we need minimum 3 workstations
d)
Workstation line balancing table is shown below
Workstation | Task assigned | Task ready | Time left | Idle time |
1 | D, A, C, | (A), (B,C), (B, E), | 0.6, 0.5, 0 | 0 |
2 | E, | (B), | 0.2 | 0.2 |
3 | B, F, | (F), (-) | 0.5, 0.1 | 0.1 |
e)
The total task time = 2.1 min
The total available time in 3 workstation = 2.4 minutes
The efficiency = total task time/total available time = 2.1/2.4 = 0.875 or 87.5%
1. [Layout Strategy-Line Balancing] The call center department of Jax-steel company needs to service 3,000 calls...
The operations manager of an instruments company is balancing an assembly line. The company needs to build 96 instruments per 24-hour day. The assembly line activities are: a. Draw the precedence diagram. b. If the daily (24-hour) production rate is 96 units, what is the greatest possible cycle time? c. If the cycle time after allowances is given as 10 minutes, what is the daily (24-hour) production rate? d. With a 10-minute cycle time, what is the theoretical minimum number...
1. A customer service call center uses customer service representatives (L) and rents computer software technology (K) to serve customer calls. Servicing each customer call requires exactly 1 hour of the representative's time and exactly 30 minutes (or half hour), of running the software application. Let Q represent the number of customers served in a day. The hourly wage and rental rate for L and K are w = $10, r = $40. a) Draw the isoquant that represents this...
QUESTION 37 A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet a schedule of 400 units per day. The tasks necessary to produce this product are detailed in the table below. Task Predecessor Time (seconds) 50 А B А 20 С А 26 D 40 B, C C E 30 a. Draw the network described in the table. b. What is the required...
Question 1- Assembly Line Balancing A ball-bearing assembly firm wants to set up an assembly line that must have an output of 60 units per hour. The work elements, task times and their precedence relationships are shown in Table 1: Table 1 Work Element Time (sec.) Immediate Predecessor(s) A 40 NONE B 30 A C 50 A D 40 B E 6 B F 25 C G 15 C H 20 D, E I 18 F, G J 30 H,...
Discussion questions 1. What is the link between internal marketing and service quality in the airline industry? 2. What internal marketing programmes could British Airways put into place to avoid further internal unrest? What potential is there to extend auch programmes to external partners? 3. What challenges may BA face in implementing an internal marketing programme to deliver value to its customers? (1981)ǐn the context ofbank marketing ths theme has bon pururd by other, nashri oriented towards the identification of...