C&A operates three eight-hour shifts to produce 600 gallons of a chemical per day. It requires 12 minutes of labor to produce a gallon of the chemical. What is C&A’s takt time in minutes per gallon and target manpower?
0.3, 40
0.8, 15
0.04, 5
2.4, 5
3 eight hour shifts produce 600 gallons. So, 1 eight hour shift
will produce 6003 = 200
gallons.
So, as 8 hrs produce 200 gallons, 1 hour or 60 mins produce
2008 = 25 gallons.
12 minutes of labour is required to produce 1 gallon, so in 1
hour 1 labour can produce 6012 = 5 gallons of
chemical.
So, to produce 25 gallons, we need 255 = 5 labours.
Again as we already know in 1 hour we can produce 25 gallons,
the time taken for producing 1 gallon overall (not per labour) is
6025= 2.4. This is
the takt time (time taken per unit of material).
So, the answer is option d i.e. 2.4,5
C&A operates three eight-hour shifts to produce 600 gallons of a chemical per day. It requires...
Question 1.Susan can brew 5 gallons of root beer in an hour or she can make 4 pizzas in an hour. Becky can brew 7 gallons of root beer in an hour or she can make 5 pizzas in an hour. Susan's opportunity cost of making a pizza is gallons of root beer. Becky's opportunity cost of making a pizza is gallons of root beer. Enter numbers rounded to two decimal places. Question 2 Bill and Fred bake cakes and...
Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department, are as follows: Department Product 1 Product 2 Product 3 A 2.00 1.50 3.00 B 2.50 2.00 1.00 C 0.25 0.25 0.25 During the next production period the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $30 for product 1, $25 for product 2,...
Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department, are as follows: Department Product 1 Product 2 Product 3 A 2.00 1.50 3.00 B 2.50 2.00 1.00 C 0.25 0.25 0.25 During the next production period the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $30 for product 1, $25 for product 2,...
I missed the labor rate on part b, so the rest of the questions are incorrect. These are the answers that I got, but I need the problem worked out to see where I went wrong. I hope that makes sense. Thank you for your help. calculate the cost and profitability of a new, dry cereal product: Rootie Tootie Frooties. Costs are to be calculated for: Ingredients Packaging Direct Labor Overhead (indirect labor, supervision, maintenance, NRG, depreciation,...
please help with COS schedule, income statement, and
variances. everything is completed and added for reference.
please complete the last 3 sections
View Help i SUBSCRIPTION EXPIRED To keep using Excel without interruption, please reactivate now. Reactivate H32 X : B for D A C E F G H I J K L M N O P Q 43 For simplicity, base all calculations using 30 days in each month OPERATIONAL DATA Grooming: The Groomer can groom 5 dogs a...
can you please complete the income statement (last
photo)
other pages are for refernce. please let me know what
additional information is needed to complete the question
TOLED Tuy Demstalled, but first we need to close some apps. Update now A B C D E F G H J K L M N O P Q R S OPERATIONAL & COST INFORMATION: For simplicity, base all calculations using 30 days in each month m OPERATIONAL DATA Grooming: The Groomer can...
Sam's Cat Hotel operates 52 weeks per year, 5 days per week, and uses a continuous review inventory system. It purchases kitty litter for $11.25 per bag. The following information is available about these bags. Refer to the for z-values. >Demand 96 bags/week > Order cost $58/order > Annual holding cost 28 percent of cost >Desired cycle-service level 90 percent > Lead time #2 week(s) (10 working days) >Standard deviation of weekly demand 10 bags >Current on-hand inventory is 300...