Ans.

1.

a)

Single Plant-Wide Overhead Rate = Total Manufacturing Overhead Cost / Direct Labor Cost

Total Manufacturing Overhead Cost = $ 120,000 + $ 180,000 = $ 300,000

Direct Labor Cost = $ 25,000 + $ 6,250 = $ 31,250

Single Plant-Wide Overhead Rate = $ 300,000 / $ 31,250 = $ 9.6

b)

Departmental Overhead Rate - Welding = Manufacturing Overhead Cost / Direct Labor hours

Departmental Overhead Rate - Welding = $ 120,000 / 2500 DLhr = $ 48 Per Direct Labor Hour

c)

Departmental Overhead Rate - Fabrication = Manufacturing Overhead Cost / Machine hours

Departmental Overhead Rate - Fabrication = $ 180,000 / 2,000 Machine hours = $ 90 per machine hour

2.

ABC Overhead Rates = Expected Cost / Expected Activity Driver

a ABC Rate - Handling $           9.60 Per part
b ABC Rate - Storing $           1.20 per sq. ft.
c ABC Rate - Inspecting $         48.00 per batch
d ABC Rate - Purchasing $         24.00 per PO
e ABC Rate - Insurance $           0.48 per sq. ft.
f ABC Rate - Cleaning $           0.24 per sq. ft.
g ABC Rate - Utilities $           7.20 per mach. Hour

Cost Assigned = Estimated production data for products * ABC Overhead rate related to it

Standard Deluxe
h Handling costs assigned $    7,200.00 $            4,800.00
i Storage costs assigned $    2,100.00 $               900.00
j Inspecting costs assigned $ 12,000.00 $         12,000.00
k Purchasing costs assigned $ 21,000.00 $            9,000.00
l Insurance costs assigned $    4,800.00 $            1,200.00
m Cleaning costs assigned $    2,400.00 $               600.00
n Utility costs assigned $    3,600.00 $            5,400.00
o Total overhead $ 53,100.00 $         33,900.00
Standard Deluxe
p Overhead Cost per unit $            3.54 $                    6.78

3.

a)

Single plant-wide rate = Total Overhead Cost / Machine Hours

Single plant-wide rate = $ 87,000 / 1,250 Machine hours = $ 69.6 per machine hour

Standard Deluxe
b Total Overhead assigned $ 34,800.00 $         52,200.00
c Overhead Cost per unit $            2.32 $                  10.44
Add a comment
Know the answer?
Add Answer to:
need help with exercise 1 parts 1-3 Exercise Oro Company has two departments with the following...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Jullo produces two types of calculator, standard and deluxe. The company is currently using a traditional...

    Jullo produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has Identified two cost pools: materials handling and setup. The collected data follow: Number of machine hours Number of material moves Number of setups Standard Model 25,7ee 585 85 Deluxe Model 30,7ee 885 535 Total estimated overhead costs are $362,930,...

  • Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional...

    Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow Number of machine hours Number of material moves Number of setups Standard ModelDeluxe Model 30,800 890 540 25,800 590 70 Total estimated overhead costs are $347,100, of...

  • Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional...

    Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow: Number of machine hours Number of material moves Number of setups Standard Model Deluxe Model 27,000 32,000 650 950 120 600 Total estimated overhead costs are $394,160,...

  • E4-14 (Algo) Assigning Costs Using Traditional System, ABC System (LO 4-1, 4-3, 4-4,4-5) Julio produces two...

    E4-14 (Algo) Assigning Costs Using Traditional System, ABC System (LO 4-1, 4-3, 4-4,4-5) Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools materials handling and setup. The collected data follow: Standard Model 26,800 Deluxe Model 31,800 Number of machine hours Number of material moves...

  • Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional...

    Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow: Number of machine hours Number of material moves Number of setups Standard Model 26,100 605 65 Deluxe Model 31,100 905 555 Total estimated overhead costs are $347.760,...

  • Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional...

    Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow. Number of machine hours Number of material moves Number of setups Standard Model 25,000 550 80 Deluxe Model 30,000 850 500 Total estimated overhead costs are $303,560,...

  • Pre-Built Problems a Julio produces two types of calculator, standard and deluxe. The company is currently...

    Pre-Built Problems a Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow Number of machine hours Number of material moves Number of setups Total estimated overhead costs are $368.360, of which $189.800 is assigned to the...

  • Ch. 17 Quiz Help Saved Way Cool produces two different models of air conditioners. The company...

    Ch. 17 Quiz Help Saved Way Cool produces two different models of air conditioners. The company produces the mechanical systems in their components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow. Process Activity Components Changeover Overhead Cost Driver Quantity Machining Setups $465,750 380,786 110.100 Number of batches Machine hours Number of setups 810 8,260 60 $956,636 $294,000...

  • Exercise 17-9 Using ABC to assess prices LO P3 Way Cool produces two different models of...

    Exercise 17-9 Using ABC to assess prices LO P3 Way Cool produces two different models of air conditioners. The company produces the mechanical systems in their components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow. Quantity Process Activity Componente Changeover Machining Setups B, 470 80 Finishing Welding Inspecting Rework Overhead Cost Driver $ 582,950 Number of batches...

  • I need help with my assignment please Way Cool produces two different models of air conditioners....

    I need help with my assignment please Way Cool produces two different models of air conditioners. The company produces the mechanical systems in their components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow Process Activity Components Changeover Machining Setups Overhead Cost Driver $ 547,350 Number of batches 358,316 Machine hours 145,200 Number of setups Quantity 890 7,640...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT