Materials for a food-processing plant are supplied by four companies. The following table lists the percentage...
transportation logistics Problem#3 (10 marks) An assembly plant is planned to take components from four suppliers and send finished goods to eight regional warehouses.. The locations of these and the amounts supplied or demanded are shown in the following table. Where would you start looking for a site for the assembly plant? Locatlon X,Y co-ordinates Supply/Demand Supplier Supplier 2 7,80 140 85,35 80 Supplier 3 120 9,81 Supplier 4 11,62 70 Supply/Demand Locatlon X,Y co-ordinates Warehouse 1 45 12,42 Warehouse...
The accompanying data table lists measured voltage amounts supplied directly to a family's home. The power supply company states that it has a target power supply of 120 volts. Using those home voltage amounts, test the claim that the mean is 120 volts. Use a 0.01 significance level. Day Volts 1 123.9 2 123.9 3 123.9 4 124.2 5 123.4 6 123.3 7 123.3 8 123.6 9 123.5 10 123.7 11 123.5 12 123.7 13 124.2 14 123.7 15 123.9...
Suppose 2 companies are competing for a percentage of the market share, and the table below represents the market share change for company B as well as three strategies that companies A and B might employ. A. If Company A offers a discount price and Company B offers a free gift with purchase, what will be the change in market share for company B? B. Company A will want to maximize the minimum payoff, thereby employing the Maximin approach to...
The following table contains information concerning four jobs that are awaiting processing at a work center. Job Job Time (Days) Due Date (Days) A 14 20 B 10 16 C 7 15 D 6 17 a. Sequence the jobs using (1) First come, first served, (2) Shortest processing time, (3) Earliest due date, and (4) Critical ratio. Assume the list is by order of arrival. Sequence for First come, first served (Click to select) A-B-C-D D-C-B-A C-B-D-A A-C-D-B Sequence for Shortest processing time (Click...
You as the engineer of the food processing plant "chick" are tasked with designing a new line to process chicken for sale in supermarkets. The new line is planned for a production of 120 chickens per hour working 8 hours per day, from Monday to Friday. On average each chicken has a mass of 1.2 kg. The chicken enters the process at 20 ° C and is submerged in a hot water bath at 90 ° C for two minutes,...
4. Use the data in the following table, which lists drive-thru order accuracy at popular fast food chains. Assume that orders are randomly selected from those included in the table. Drive-thru Restaurant A B C 325 277 238 33 56 39 Order Accurate Order Not Accurate D 145 11 If one order is selected, find the probability of getting an order from Restaurant A or an order that is accurate. Are the events of selecting an order from Restaurant A...
last question fails to reject or reject and sufficient and insufficient. The accompanying data table lists measured voltage amounts supplied directly to a family's home. The power supply company states that it has a target power supply of 120 volts. Using those home voltage amounts test the claim that the mean is 120 volts. Use a 0.01 significance level Click the icon to view the sample data. Cick the icon to viewa table of crtical 1-values What are the nul...
A company makes four products: Product A sells for $50 but needs $10 of materials; Product B sells for $75 but needs $30 of materials; Product C sells for $100 but needs $50 of materials; Product D sells for $150 but needs $75 of materials. The labor cost is $15/hr. The processing requirements for each product on each of the four machines are shown in the table. Table 6 Work Center Processing Time (min/unit) A B C D W 3...
Please answer the following questions: Suppose that Leisureland produces only two goods-food and sunscreen. The table gives its production possibilities. Food (lbs/month) Sunscreen (lbs/month) 300 and 0 200 and 50 100 and 100 0 and 150 1)Draw a graph of Leisureland's production possibility frontier. 2)What are the opportunity costs of producing food and sunscreen in Leisureland? List them at each output given in the table. 3)Why are the opportunity costs the same at each output level? Busyland also produces only...
Sanderson Steel Company manufactures 3 types of steel at 3 different plants. The time required to manufacture 1 ton of steel and the costs at each plant are shown in the table below. Each week, 100 tons of each type of steel must be produced. Each plant is open 40 hours per week. Formulate this transportation problem to minimize the cost of meeting Sanderson’s weekly requirements. having troubles with this problem, please help! 5. (7.5 point) Sanderson Steel Company manufactures...