A project has the following cash flows:
Year 0: -$130,000
Year 1: $60,000
Year 2: $0
Year 3: $100,000
Year 4: $0
Year 5: $60,000
The discount rate is 18%. Calculate the internal rate of return (IRR).
17-18% |
||
18-19% |
||
20-21% |
||
21-22% |
||
None of the above. |
We need at least 10 more requests to produce the answer.
0 / 10 have requested this problem solution
The more requests, the faster the answer.
A project has the following cash flows: Year 0: -$130,000 Year 1: $60,000 &nbs
An investment project has the following cash flows: Year Contributions Returns 0 1 100,000 0 0 10,000 2 0 20,000 3 0 30,000 4 0 20,000 5 0 10,000 Calculate the internal rate of return on this investment An investment project has the following cash flows: Year Contributions Returns 0 1 100,000 0 0 10,000 2 0 20,000 3 0 30,000 4 0 20,000 5 0 10,000 Calculate the internal rate of return on this investment An investment project has...
1. Allen Inc., is considering a project with the following cash flows. Year Cash Flows 0 -$32,374 1 $6,334 2 $13,790 3 $12,995 4 $20,673 5 $29,260 The company uses a discount rate of 7 percent on all of its projects. Calculate the profitability index of the project? 2. Elway Corp. is considering a project with the following cash flows. Year Cash Flows 0 -$45,331 1 $15,903 2 $24,490 3 $34,625 4 -$11,486 5 $40,937 The company uses a discount...
A project has the following cash flows: Year Cash Flows 0 -2,500 1 750 2 800 3 500 4 400 5 300 6 250 What is the Internal Rate of Return (IRR) of this project?
A project has the following cash flows: Year Cash Flows 0 −$130,000 1 60,200 2 63,800 3 51,600 4 28,100 The required return is 8.1 percent. What is the profitability index for this project? A.946 b. 1.101 c. 1.321 D. 1.211 E..757
Problem 30.6 An investment project has the following cash flows: Year Contributions Returns 0 100,000 1 0 10,000 20 20,000 30 30,000 20,000 50 10,000 Calculate the internal rate of return on this investment.
8. An investor has the opportunity to invest in the following project. The cash flows over a period of 5 years are shown in the table below Calculate the Internal Rate of Return (IRR) Use values of 7 % and 9 % as trial values Year Receipts (AED) Payments (AED) 400,000 Net Cash Flow (AED) (400 000) 100,000 100,000 100,000 100,000 100,000 0 1 100,000 100,000 100,000 100,000 100,000 2 3 4 5
Consider four projects, which you expect to generate the following cash flows: Year Project A Project B Project C Project D 0 (200,000) (2,000) (200,000) (200,000) 1 210,000 18,000 100,000 90,000 2 (100,000 is for project c & d ONLY) 100,000 100,000 3 100,000 115,000 , Your required return on all of the investments is 8%. For each project estimate the Payback Period, Internal Rate...
A project has the following cash flows: Year Cash Flow 0 $ 66,500 1 –41,000 2 –32,800 What is the IRR for this project? (Do not round intermediate calculations and enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.) Internal rate of return % What is the NPV of this project if the required return is 4 percent? (A negative answer should be indicated by a minus sign. Do not round intermediate calculations and round your...
The IRR evaluation method assumes that cash flows from the project are reinvested at the same rate equal to the IRR. However, in reality the reinvested cash flows may not necessarily generate a return equal to the IRR. Thus, the modified IRR approach makes a more reasonable assumption other than the project’s IRR. Consider the following situation: Celestial Crane Cosmetics is analyzing a project that requires an initial investment of $2,750,000. The project’s expected cash flows are: Year Cash Flow...
4. Lepton Industries has a project with the following projected cash flows: Initial Cost, Year 0: $468,000 Cash flow year one: $135,000 Cash flow year two: $240,000 Cash flow year three: $185,000 Cash flow year four: $135,000 Plot the NPV profile of this project in Excel. Start with discount rate equal to zero and increase the discount rate by 2% increments until discount rate equal to 30%. For what discount rates would Lepton accept this project? For what discount rates...