Suppose SUB AX, BX is executed. In each of the following parts, the 1st number is the initial contents of AX and the second number is the contents of BX. Give the resulting value of AX and tell whether signed or unsigned overflow occurred. a. 2143h - J986h b. 8JFEh - 1986h c. 19BCh - 81fEh d. 0002h – FEOFh e. 8BCDh - 71ABh
We need at least 10 more requests to produce the answer.
0 / 10 have requested this problem solution
The more requests, the faster the answer.
Suppose SUB AX, BX is executed. In each of the following parts, the 1st number is the initial contents of AX and the second number is the contents of BX. Give the resulting value of AX and tell whether signed or unsigned overflow occurred. a. 2143h
1. Registry conditions: A. Show how the decimal integer * -120 would be stored in 16 bits * -120 would be stored in 8 bits * -32456 would be stored in 32 bits * -32456 would be stored in 16 bits B. For each of the following decimal numbers, tell whether it could be stored (1) as a 16-bit number (2) as an 8-bit number. * 32768 * -40000 *...
Need help on Assembly language 1.Solve the following conditions: A. Suppose AL contains 11001011 and CF = 1. Give the new contents of AL after each of the following instructions is executed. Assume the above initial conditions for each part of this question. a. SHL AL,1 b. SHR AL,1 c. ROL AL,2 d. ROR AL,3 e. SAR AL,2 f. RCL AL,1 g. RCR AL,3 B. Suppose EAX contain ABCDH. Show the contents of BX and CX after...
These are my answere to the following questions: are they right? 1. B 2. T 3. T 4. T 5. F 6. T 7. A 8. D 9. E 10. B 11. B 12. A 13. A 14. D 15. C 16. D 17. T 18. C 19. T 20. T 21. T 22. A 23. T 24. D 25. B 26. A 27. A 28. A 29. T 30. C 31. D 32. A 33. T 34. F 35....
photos for each question are all in a row (1 point) In the following questions, use the normal distribution to find a confidence interval for a difference in proportions pu - P2 given the relevant sample results. Give the best point estimate for p. - P2, the margin of error, and the confidence interval. Assume the results come from random samples. Give your answers to 4 decimal places. 300. Use 1. A 80% interval for pı - P2 given that...
How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...