Question

Water from a large tank is used to generate electricity by installing a hydraulic turbine- generator at 100 m down from the w

0 0
Add a comment Improve this question Transcribed image text
Answer #1

て.yasin Goncreto- Po erahn J/s 1960, e 1960 kJ/s = 1960 kw fmech 960 Welt,our l-

Add a comment
Know the answer?
Add Answer to:
Water from a large tank is used to generate electricity by installing a hydraulic turbine- generator...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The water in a large lake is to be used to generate electricity by the installation...

    The water in a large lake is to be used to generate electricity by the installation of a hydraulic turbine generator at a location where the depth of the water is 50 m. Water is to be supplied at a rate of 5000 kg/s. If the electric power generated is measured to be 1862 kW and the generator efficiency is 95 percent, determine (a) the overall efficiency of the turbine-generator, (b) the mechanical efficiency of the turbine, and (c) the...

  • 9) Electrical power is to be generated by installing a hydraulic turbine-generator at a site 70...

    9) Electrical power is to be generated by installing a hydraulic turbine-generator at a site 70 m below the free surface of a large water reservoir that can supply water at a rate of 1500 kg/s steadily. If the mechanical power output of the turbine is 800 kW and the electric power generation is 350 kW, determine the turbine efficiency and the combined turbine-generator efficiency of this plant. Neglect losses in the pipes. (10pts).

  • Required information NOTE: This is a multi-part question Once an answer is submitted, you will be...

    Required information NOTE: This is a multi-part question Once an answer is submitted, you will be unable to return to this part The water in a large lake is to be used to generate electricity by the installation of a hydraulic turbine-generator a location where the depth of the water is 62 m. Water is to be supplied at a rate of 5000 kg/s. If the electric power generated is measured to be 1862 kW and the generator efficiency is...

  • How many kW of electricity can a turbine generator operating at a head of 100 m, with a flow of 20 m3/s deliver? Assume that the water turbine has 90% efficiency?

    How many kW of electricity can a turbine generator operating at a head of 100 m, with a flow of 20 m3/s deliver? Assume that the water turbine has 90% efficiency?

  • Required information NOTE: This is a multi-part question. Once an answer is submitted, you will be...

    Required information NOTE: This is a multi-part question. Once an answer is submitted, you will be unable to return to this part. The water in a large lake is to be used to generate electricity by the installation of a hydraulic turbine-generator at a location where the depth of the water is 57 m. Water is to be supplied at a rate of 5000 kg/s. If the electric power generated is measured to be 1862 kW and the generator efficiency...

  • WGTC η.cn = 95% Gas turbine cycle (GTc) e,I = 100 kW Compressor Turbine Generator 께,- Combustor ...

    wGTC η.cn = 95% Gas turbine cycle (GTc) e,I = 100 kW Compressor Turbine Generator 께,- Combustor Pi 100 kPa Regenerator Evaporator Turbine Generator Vapor turbine cycde (VTC) T, = T, + 20 K Condenser 10 Pump Saturated liquid A combined cycle plant operates with a topping gas turbine and a bottoming vapor turbine cycle. The working fluid in the vapor turbine cycle is water. The gas turbine cycle (GTC) electric generator produces 100kW of electric power For air use...

  • A small town decides to use its water tower to generate emergency power. The water tank...

    A small town decides to use its water tower to generate emergency power. The water tank holds approximately 50,000 gallons of water, and its top surface is maintained at an elevation, Az, of 33 m above the ground. The town typically needs 250 kW of power. They have an available, 92%-efficient generator, which operates at 60 Hz. They also have an interconnected gearbox with a 5:1 ratio, which can permit lower turbine rotational speeds. a. What type of turbine should...

  • A micro hydro turbine is used to generate hydroelectric power by letting liquid water from a...

    A micro hydro turbine is used to generate hydroelectric power by letting liquid water from a high elevation run through the turbine to a low elevation. The turbine is under a steady state operation condition. The inlet water and outlet water are at elevations of 10 m and 2 m, respectively. The inlet and outlet diameters are 0.3 m and 0.5 m, respectively. The inlet pressure is 2.5 bar and the outlet pressure 1 bar. The inlet and outlet temperatures...

  • 9. The absolute pressure in water at a depth of 5 m is 145 kPa. What...

    9. The absolute pressure in water at a depth of 5 m is 145 kPa. What is the absolute pressure in a liquid whose specific gravity is 1.34 at the same depth? Hint: Determine the atmaspheric pressure first 10. Water is pumped from a lake to a storage tank 30 m above at a rate of 55 L/s, while consuming 22.6 kW of electrie power to run the motor. Detemine the overall efficiency of the motor-pump unit. .A hydraulic power...

  • 25. In a hydroelectric dam, water falls 25 m and then spins a turbine to generate...

    25. In a hydroelectric dam, water falls 25 m and then spins a turbine to generate electricity. a) What is U, of 1.0 kg of water? b) Suppose the dam is 80% efficient at converting the water's potential energy to electrical energy. How many kilograms of water must pass through the turbines each second to generate 50 MW of electricity? This is a typical value for a small hydroelectric dam.

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT