Question

9) Electrical power is to be generated by installing a hydraulic turbine-generator at a site 70 m below the free surface of a large water reservoir that can supply water at a rate of 1500 kg/s steadily. If the mechanical power output of the turbine is 800 kW and the electric power generation is 350 kW, determine the turbine efficiency and the combined turbine-generator efficiency of this plant. Neglect losses in the pipes. (10pts).

0 0
Add a comment Improve this question Transcribed image text
Answer #1

olucion Given eat Given data eg Powa turbine ,» w Y conven ence. C. e cans egpes ut Mansbecomes (OoD tee raio ot Poes lades loturbine (024 ·Tae turbine effalu ubi . e Combin ineae C Dowes Welect-out Wmed o 2 turbine-gem

Add a comment
Know the answer?
Add Answer to:
9) Electrical power is to be generated by installing a hydraulic turbine-generator at a site 70...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Water from a large tank is used to generate electricity by installing a hydraulic turbine- generator...

    Water from a large tank is used to generate electricity by installing a hydraulic turbine- generator at 100 m down from the water surface as shown in Figure QS. The water is supplied to the turbine at a rate of 2000 kg's. If the mechanical power input of the turbine is 1800 kW and the generator efficiency is 80%, determine the percentage reduction of efficiency between generator alone and combination of turbine-generator Consider the water density as 1000 kg/m (7...

  • A hydraulic power system, as shown in the picture, has an elevation difference between the reservoir...

    A hydraulic power system, as shown in the picture, has an elevation difference between the reservoir water surface and the downstream water pond surface of H( 7 m). A discharge of 0.8 m3/s flows through the penstock and spins a hydraulic turbine, which in turn drives a generator to produce electric power. Estimate the electric power generated if the head loss through the entrance, penstock and exit is 1 m, L and the efficiency of the turbine and generator are...

  • 9. The absolute pressure in water at a depth of 5 m is 145 kPa. What...

    9. The absolute pressure in water at a depth of 5 m is 145 kPa. What is the absolute pressure in a liquid whose specific gravity is 1.34 at the same depth? Hint: Determine the atmaspheric pressure first 10. Water is pumped from a lake to a storage tank 30 m above at a rate of 55 L/s, while consuming 22.6 kW of electrie power to run the motor. Detemine the overall efficiency of the motor-pump unit. .A hydraulic power...

  • The water in a large lake is to be used to generate electricity by the installation...

    The water in a large lake is to be used to generate electricity by the installation of a hydraulic turbine generator at a location where the depth of the water is 50 m. Water is to be supplied at a rate of 5000 kg/s. If the electric power generated is measured to be 1862 kW and the generator efficiency is 95 percent, determine (a) the overall efficiency of the turbine-generator, (b) the mechanical efficiency of the turbine, and (c) the...

  • 3.Consider a process in which a wind turbine moves an electrical generator is used to produce...

    3.Consider a process in which a wind turbine moves an electrical generator is used to produce electrical power, which is then transmitted to your home for use in your electric lawn mower. If mower blade uses 0.16 kWh of mechanical energy to cut your grass, how much wind energy is necessary? DEVICE EFFICIENCY Electric motor 75% Wind turbine 40% Electric generator 88% Electric transmission lines 90% Solar cell 18% Gas auto engine 25%

  • WGTC η.cn = 95% Gas turbine cycle (GTc) e,I = 100 kW Compressor Turbine Generator 께,- Combustor ...

    wGTC η.cn = 95% Gas turbine cycle (GTc) e,I = 100 kW Compressor Turbine Generator 께,- Combustor Pi 100 kPa Regenerator Evaporator Turbine Generator Vapor turbine cycde (VTC) T, = T, + 20 K Condenser 10 Pump Saturated liquid A combined cycle plant operates with a topping gas turbine and a bottoming vapor turbine cycle. The working fluid in the vapor turbine cycle is water. The gas turbine cycle (GTC) electric generator produces 100kW of electric power For air use...

  • hydroelectric power plant problem provided in a standby plantr Tme enceCythe hyuidelectiic lali wiii The demand for electric power is usually much lighter during the day than it is at night, and u...

    hydroelectric power plant problem provided in a standby plantr Tme enceCythe hyuidelectiic lali wiii The demand for electric power is usually much lighter during the day than it is at night, and utility companies often sell power at night at much lower prices to encourage consumers to use the available power generation capacity and to avoid building new expensive power plant that will be used only a short time during peak periods. Utilities are also to purchase power produced during...

  • Required information NOTE: This is a multi-part question Once an answer is submitted, you will be...

    Required information NOTE: This is a multi-part question Once an answer is submitted, you will be unable to return to this part The water in a large lake is to be used to generate electricity by the installation of a hydraulic turbine-generator a location where the depth of the water is 62 m. Water is to be supplied at a rate of 5000 kg/s. If the electric power generated is measured to be 1862 kW and the generator efficiency is...

  • 3-86 The demand for electric power is usually much higher during the day than it is...

    3-86 The demand for electric power is usually much higher during the day than it is at night, and utility companies often sell power at night at much lower prices to encourage con- sumers to use the available power generation capacity and to avoid building new expensive power plants that will be used only a short time during peak periods. Utilities are also will ing to purchase power produced during the day from private parties at a high price. Suppose...

  • a) The following figure shows a water dam built for a hydroelectric power project running constantly...

    a) The following figure shows a water dam built for a hydroelectric power project running constantly round the year. During a dry season, it acts as water reservoir of constant height 80 m. Meanwhile rainy season, water flow of 3 m/s is added to the system. (Water density 10x10 kg/m' and volume flow, V = 45x10 m/s respectively and the gravitational acceleration is about 9.8 kg/m for both seasons). Evaluate the followings: Ravet afsec RE Figure 2: Water flow utilization...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT