Question 25 Write down incremental coordinates for the following part using diameter dimensions when O is...
CE2711-FM.pdf O file://C/Users/Sachin/Desktop/Past%20papers/Eng/CE2 711-FM.pdf - (25 marks) Question 02 Explain momentum and write down the basic formula to find the momentum in mechanics. a) (05 marks) e bave to consider when we apply the momentum b) What the two most important factors that principle. (05 marks) c) A water jet from a nozzle is deflected through an angle 60° from its original dircction by a curved vane which it enters tangentially (see Figure 2.1) without shock with a mean velocity...
Question 3 (covers Unit 6) - 25 marks . Your answers to part (a) of this question must be shown with your own work . Part (b) and (c) of this question are required you to use Mathcad to compute your solutions. You must submit a copy or attached a copy of your Mathcad solutions to your tutor for marking (a) Consider the following matrix 2 1 -2 A-0 5 0 (i) Find three eigenvalues λ of A. One of...
We
Part (a) [2 marks]
The angular displacement of the rigid body ranges from
θ = 0° (the vertical as shown in the figure) to θ
= 135° and can be modelled using simple harmonic motion. Assuming a
rate of 20 [reps/min], write down an expression for angular
displacement, θ [rad] as a function of time, t [s]. You may assume
that the motion starts with an angular displacement of 135°.
Hint: The angular displacement, θ can be expressed as...
1. For each of the following regression models, write down the X matrix and 3 vector. Assume in both cases that there are four observations (a) Y BoB1X1 + B2X1X2 (b) log Y Bo B1XiB2X2+ 2. For each of the following regression models, write down the X matrix and vector. Assume in both cases that there are five observations. (a) YB1XB2X2+BXE (b) VYBoB, X,a +2 log10 X2+E regression model never reduces R2, why 3. If adding predictor variables to a...
Question 1 A turning operation is carried out on aluminum. Based on the specific energy values in Table 20.2, determine material removal rate and cutting power in the operation under the following sets of cutting conditions: (a) Cutting speed 5.6 m/s, feed 0.25 mm/rev, and depth of cut 2.0 mm; and (b) cutting speed- 1.3 m/s, feed 0.75 mm/rev, and depth 4.0 mm. Question 2 Consider a turning operation performed on steel whose hardness 225 HB at a cutting speed...
Use program control statements in the following exercises: Question 1 . Write pseudocode for the following: • Input a time in seconds. • Convert this time to hours, minutes, and seconds and print the result as shown in the following example: 2 300 seconds converts to 0 hours, 38 minutes, 20 seconds. Question 2. The voting for a company chairperson is recorded by entering the numbers 1 to 5 at the keyboard, depending on which of the five candidates secured...
Sent
Need the answers for that whole question paper
True or false questions
(25) has any effect SECTION TRUE OR FALSE QUESTION (40 Marks) The following questions indicate if it's True or False. Each question carries 2 Marks 1. Accounting Principle is general law or rule followed in the preparation of financial statements 2. Usefulness, objectivity and feasibility are the three basic norms generally found in accounting principles 3. The Cash book record only the cash payments 4. If a...
Question I.5 Figure 1.5 shows a frame with loads at A and D. Select the closest value for the magnitude of the total reaction at B. Assume the weight of the frame is zero. 40 kN VE 96.2 kN (a) (Ь -40 kN 5 m (c) -87.5 kN 30 kN (d) 57 kN 4m ao 1 m (e) 50 kN Figure L.5 Low mass frame Question I.6 In the shear and bending moment equations for beams, which of the following...
Question 6: We will consider a piece-wise constant 1D signal in this part. Assume the signal (a function f(t)) contains S = 10 discrete sub-intervals of equal length. Each sub-interval contains 50 samples. This signal is given below in the variable signal acquired at sample locations sampling_locations (also provided below). Plot the 1D signal, create one plot with the regular plot commands and one plot with the stem command (use subplots to plot the two next to each other in...
Instruction: Complete a Master Budget in Excel
using the following assumptions and template using Excel
formulas
SHOW ME ALL THE FORMULAS PLEASE! THAT'S THE MOST
IMPORTANT PART. THANK YOU. I've already done the last 3. Please
check.
Sales Budget Expected sales volume: 4,100 units in the first quarter with 500-unit increases in each succeeding quarter. Sales price: $65 per unit. Production Budget Company can meet future sales needs with an ending inventory of 20% of next quarter's budgeted sales volume....