Problem 1) (a) Fill in the given table for the following external threads. e following external...
for external Maintenan diameter of a screw thread is h 1. The diameter measured from root to root fo thread. A. major B. minor C. pitch D. outside 2. The thread permitted in engagement between mating A. form B. series C. pitch specifies the amount of tole of tolerance mating threads D. class 3. Which of the following has a head at one end external threads at the other to accept a nut A. Self-tapping screw B. Washer C. Retaining...
Threaded metric fasteners are available in several systems, two of which are given in Table 31.1: coarse and fine. Fine threads are not cut as deep and, as a result, have a larger tensile stress area for the same nominal diameter. Using a proof strength of 228 MPa and a 12 mm bolt, determine the (a) maximum preload that can be used for coarse pitch and fine pitch threads and (b) percent increase in preload of fine threads compared to...
82.6 642 6.40 - 57 5.4 R0.8 MAX 28.6 035 28.4 #51 3 45 ф100 R3 #8.5 M10 X 1.5-6H 45 4X 10.5 NOTE: ALL DIMS IN mm ーAX 90. GRAY IRON FIN. DIMS i02 UNFİN, DIMS 최 ANGLE ±0° 30' FLANGED HUB 31A059 2 Refer to drawing 31A059 to answer the following questions. the units of measurement in (a) inches, (b) millimeters, or (c) centimeters? 2. Is the section view a (a) half-section or a (b) full section? what...
Please help with table sample. Appendix B is provided below. Thanks. Table sample: ¼ diameter fine thread Thread Note ¼ - 28 UNF Minor Diameter .211 Pitch 1/28 = .0357 7/8 coarse thread Thread Note Minor Diameter Pitch ¾ diameter fine thread Thread Note Minor Diameter Pitch ½ diameter coarse thread Thread Note Minor Diameter Pitch Using Table B.3.4 complete the following information Nominal Screw Size Normal Fit Hole Size Counterbore Diameter #10 .221 3/8 3/8 3/4 1 1/2 [...
1. Fill in the missing values in the following table of relative frequency. I am stuck on this question since I was not given the sample size. If someone could help me that would be awesome! Class Frequency Relative Frequency Cumulative Relative Frequency 1 to 5 14 0.10 0.10 6 to 10 0.15 11 to 15 21 16 to 20 28 21 to 25 0.35 26 to 30 1.00
operating system engineering , please read the question and solve on the given skeleton code . Write a multi-threaded program with Semaphores as counters and pthread_mutex_t mutex to solve the producer-consumer problem: A bounded buffer is simply a global integer array of size N (2) which can be accessed by multiple threads. • Create two types of threads - Producer (2) and Consumer (2). Producers will write to the buffer, and the consumers will read the buffer. In this scenario,...
Question 1 A turning operation is carried out on aluminum. Based on the specific energy values in Table 20.2, determine material removal rate and cutting power in the operation under the following sets of cutting conditions: (a) Cutting speed 5.6 m/s, feed 0.25 mm/rev, and depth of cut 2.0 mm; and (b) cutting speed- 1.3 m/s, feed 0.75 mm/rev, and depth 4.0 mm. Question 2 Consider a turning operation performed on steel whose hardness 225 HB at a cutting speed...
Please show solution for O step by step, use data and ansers for N as given (O)For the bolt of question (N) above, what is the required tightening torque? Answer Box: Torque 141 lb-in Total Clamping Force: F,-| 12,000 |lb Number of Bolts: N- Percentage of Proof Strength: PP- 75% SAE Grade 5 Steel Bolt Material Proof Strength of Bolt material: σ a 85,000 psi Lubrication Constant: K 0.15 Results Formula P FrIN Load on each Screw. P- 3000 b...
Fill out the table for the knapsack problem, where the objects, weights, and values are as given, and the overall weight limit is 10 Next, circle the entries in the table that are used when backtracking to find objects to use in the solution Then list the object numbers that can be used for an optimal solution .Also list the weights and values of those objects Verify that the values of your solution objects add up to the optimal number...
4. (8 points) Given the following table of timing results for problem size N and run time T(N) with the assumption that T(N)- aNo, what is the estimate for b? 2000b slape 0 4000 8000