S. A 200 lb cable is loo ft long and hangs vertically from the top of...
A heavy rope, 40 ft long, weighs 0.8 lb/ft and hangs over the edge of a building 110 ft high. How much work is done in pulling the rope to the top of the building? 710ft-lb 730ft-lb 750ft-lb 740ft-lb 640 ft-lb
(1 point) Book Problem 9 A heavy rope, 20 ft long, weighs 0.9 lb/ft and hangs over the edge of a building 130 ft high a) How much work is done in pulling the rope to the top of the building? Work ft-lb. a) How much work is done in pulling half the rope to the top of the building? Work ft-lb. (1 point) Book Problem 15 An aquarium 10m long, 5m wide, and 9m deep is full of water....
An electric elevator with a motor at the top has a multistrand cable weighing 4 lb/ft. When the car is at the first floor, 150 ft of cable are paid out, and effectively 0 ft are out when the car is at the top floor. How much work does the motor do just lifting the cable when it takes the car from the first floor to the top? The amount of work required is ft-lb. (Simplify your answer.)
9. A crane lifts a 2,000 lb load vertically 30 ft with a 1" cable weighing 1.68 lb/ft. (a) How much work is done lifting the cable alone? (b) How much work is done lifting the load alone? (c) Could one conclude that the work done lifting the ca- ble is negligible compared to the work done lifting the load? 9. A crane lifts a 2,000 lb load vertically 30 ft with a 1" cable weighing 1.68 lb/ft. (a) How...
Please answer all questions, and I will rate you well! Thanks :) 2. 12/18 points | Previous Answers SCalcET8 6.4.013.MI My Note A heavy rope, 60 ft long, weighs 0.5 lb/ft and hangs over the edge of a building 150 ft high. (Let x be the distance in feet below the top of the building. Enter xas x,.) (a) How much work W is done in pulling the rope to the top of the building? Show how to approximate the...
A cable that weighs 4 lb/ft is used to lift 1200 lb of coal up a mine shaft 600 ft deep. Find the work done Work = ft-lb.
mo 1 a) A hoodlum through a stone vertically down ward with an initial ft/s from the roof of 60 ft tall building. A) How long does it take the ston the ground, b) What is the speed of the stone at that impact
A 60-m-long chain hangs vertically from a cylinder attached to a winch. Assume there is no friction in the system and that the chain has a density of 9 kg/m. Use 9.8 m/s for the acceleration due to gravity. a. How much work is required to wind the entire chain onto the cylinder using the winch? b. How much work is required to wind the chain onto the cylinder if a 50-kg block is attached to the end of the...
2. A chain weighing 2.3 lb/ft is used to lift a 1500 lb generator 250 ft to the roof of a building. [7pts] (a) How much work is done in the "fixed' part of the problem? (b) How much work is done in the variable' part of the problem? (c) What is the total amount of work done in this situation?
11. Lifting an elevator cable An electric elevator with a motor at the top has a multistrand cable weighing 4.5 lb/ft. When the car are out when the car is at the top floor. How much work does the is at the first floor, 180 ft of cable are paid out, and effectively 0ft motor do just lifting the cable when it takes the car from the first Aoor to the top?