Help me please solve that question about probability in water resources Engineering
We need at least 10 more requests to produce the answer.
0 / 10 have requested this problem solution
The more requests, the faster the answer.
a)A highway culvert s required to accommodate a design discharge that has a return period of 50 this design. b)A town depends on the flow of a nearby stream for its water supply. If the discharge drops below /s, several emergency actions begin. The long
12.4.4. A city depends on the flow of a nearby river for its water supply. If the discharge drops below a base level of 30 m/sec, various emergency actions begin. After two consecutive days of sub-base flow, a small reservoir is brought online; after 10 consecutive days of sub-base flow, water must be piped in from a nearby town. River discharge records have been assessed to determine the excee- dence probability of the two-day drought (70 percent) and the 10-day...