Question

2. For the geometry of Problem 6-19, assume d-2.4 in. and E 29E6 psi a) Using line elements in ANSYS Workbench, determine the deflection at the location of the 8 kip load. b) Assume it is necessary to reduce the deflection found in part (a) by 50%. Specify a new value for d and verify your result using line elements in ANSYS/Workbench. Report d and your new deflection
media%2F77f%2F77f43a6e-befc-43fa-bd62-f9
0 0
Add a comment Improve this question Transcribed image text
Answer #1

I dont have attached ansys result file because this HomeworkLib answer box layout doesn't support it. I can't upload screenshot images neither because image size is large and here I can upload only 2 MB data. Sorry for inconvience. Hope this helps.

Add a comment
Know the answer?
Add Answer to:
2. For the geometry of Problem 6-19, assume d-2.4 in. and E 29E6 psi a) Using...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 2. For the transfer functions in problem 1 (a)(d)(e), find the corresponding impulse response functions h(t) using par...

    2. For the transfer functions in problem 1 (a)(d)(e), find the corresponding impulse response functions h(t) using partial fraction expansion and determine the value of lim h(t) if the limit exists. Verify that lim- n(t)-0 for stable systems. (optional) After performing the partial fraction expansion by hand (required), yoiu are encouraged to use MATLAB to verify your results. MATLAB has a function called 'residue' that can calculate poles (pi) and residues (ci). For example, the following line will calculate the...

  • QUESTION 1 Using the following declarations and a member of the Array class, int [ ]...

    QUESTION 1 Using the following declarations and a member of the Array class, int [ ] bArray = new int [10]; int location; Using a method in the Array class, write a statement that would change the order of the elements in the bArray array. The contents of the first cell should hold what was in the last cell. The second cell should hold what was in the next to last cell. __________________________ HINT: You must write the full statement...

  • Problem 10.19 Consider the frame shown in (Figure 1). Assume the support at A is fixed...

    Problem 10.19 Consider the frame shown in (Figure 1). Assume the support at A is fixed and C is a pin. EI is constant. Part A Determine the internal end moment MBA acting on member AB of the frame at B measured clockwise. Express your answer using three significant figures. Enter positive value if the moment is clockwise and negative value if the moment is counterclockwise. MBA = 40.8 k ft Submit Previous Answers Correct Part B Determine the internal...

  • a) Find the multiple regression equation using all three explanatory variables. Assume that X1 is mid-term...

    a) Find the multiple regression equation using all three explanatory variables. Assume that X1 is mid-term score, X2 is hours studying per week and x3 is hours watching television per week. Give your answers to 3 decimal places. û = mid-term score + hours studying + hours watching television + b) At a level of significance of 0.05, the result of the F test for this model is that the null hypothesis rejected. c) The explanatory variable that is most...

  • "Annexure B" ASSIGNMENT 2 DESIGN BRIEF Due to increasing pedestrian traffic of students travelling from halls of residence to the engineering block at one of its devised a...

    "Annexure B" ASSIGNMENT 2 DESIGN BRIEF Due to increasing pedestrian traffic of students travelling from halls of residence to the engineering block at one of its devised a plan, which includes a new means of crossing a busy road safely and without causing traffic delay. A solution to protect student safety for crossing the busy road is to design and build a pedestrian bridge. This will eliminate traffic congestion and delays as well as eliminate conflict between pedestrians and motorists....

  • Question 6 e and f 5) Base scenario calculations: Using the Profit Formula calculated in 5)...

    Question 6 e and f 5) Base scenario calculations: Using the Profit Formula calculated in 5) above, calculate the following assuming TrucBeat produces and sells 6,000 units as their "base" scenario Sales Revenue 6,00 SIL - 3.045,00 Net Operating Income 1,778. Ob Contribution Margin 2.052/ Contribution Margin Contribution Margin percent 2.082,0/3,091,00 87.252 Break-even in units 304,0*/62087, 00/000304,00) 347 976 units Break-even in dollars 3040/67.25 452,046 Margin of safety in units 6.400- 76+ 5.124 wnik Margin of safety percent (3.06,0 -...

  • Problem 11-19 Internal Business Process Performance Measures (LO11-3] Tombro Industries is in the process of automating...

    Problem 11-19 Internal Business Process Performance Measures (LO11-3] Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four...

  • How do I solve this? Problem 2(50 points) The roof of the Edwin A. Stevens building...

    How do I solve this? Problem 2(50 points) The roof of the Edwin A. Stevens building is to be redesigned to accommodate a billboard for Stevens Institute of Technology. The new billboard will weigh 40 kips and be supported equally by two columns located 9 ft from the rear of the building. The beams supporting the new roof will be simply supported as shown. (Note there is a 5 ft overhang at the front of the building). For the grade...

  • Question 6: We will consider a piece-wise constant 1D signal in this part. Assume the signal...

    Question 6: We will consider a piece-wise constant 1D signal in this part. Assume the signal (a function f(t)) contains S = 10 discrete sub-intervals of equal length. Each sub-interval contains 50 samples. This signal is given below in the variable signal acquired at sample locations sampling_locations (also provided below). Plot the 1D signal, create one plot with the regular plot commands and one plot with the stem command (use subplots to plot the two next to each other in...

  • Concurrent Key-Value Database Implement a non-persistent, concurrent key-value database using the Reader/Writers algorithm. - Use a...

    Concurrent Key-Value Database Implement a non-persistent, concurrent key-value database using the Reader/Writers algorithm. - Use a hashmap as the underlying data structure. Inspiration is ok, however the implementation must be yours. The hashmap must be able to grow to fit new elements, but it does not need to reduce its size. -- Linked lists? Positional arrays? All are fine. - Keys and values are strings (char *) - Operations are: get, put Provided files: - Implement the contract set in...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT