a hydroelectric plant is designed so that 4518 cubic meters of water fall each second from a height of 262 meters. if the change in potential energy of one cubic meter of water at this plant is 1.59MJ, the power generated by the plant is...
The answer is 7.2GW
b. An onshore wind turbine is rated for a maximum capacity of 2MW and generates 1.5MW when the wind is blowing at 30mph. How much power will it generate when wind speeds are 10mph?
The answer is 0.055MW
Please explain...
Answer:- a) The potential energy of one cubic
meter of water is 1.59 MJ.
The power generated by the plant is the energy changed
of water each second. The potential energy change
each second or the power generated by the plant is-
Answer:- b) The wind turbine power and speed are related as-
Thus we can write-
a hydroelectric plant is designed so that 4518 cubic meters of water fall each second from...
I have this case study to solve. i want to ask which type of case study in this like problem, evaluation or decision? if its decision then what are the criterias and all? Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...