Question

Older railroad tracks in the U.S. are made of 12-m-long pieces of steel. When the tracks...

Older railroad tracks in the U.S. are made of 12-m-long pieces of steel. When the tracks are laid, gaps are left between the sections to prevent buckling when the steel thermally expands. Part A If a track is laid at 16∘C, how large should the gaps be if the track is not to buckle when the temperature is as high as 50∘C?

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Older railroad tracks in the U.S. are made of 12-m-long pieces of steel. When the tracks...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Older railroad tracks in the U.S. are made of 12-m-long pieces of steel. When the tracks...

    Older railroad tracks in the U.S. are made of 12-m-long pieces of steel. When the tracks are laid, gaps are left between sections to prevent buckling when the steel termally expands. If a track is laid at 16*C, how large should the gaps be if the track is not to buckle when the temperature is as high as 50*C?

  • During the construction of the LRT railroad track, hot rolled structural steel A36 of 10-m-long rails...

    During the construction of the LRT railroad track, hot rolled structural steel A36 of 10-m-long rails were used. The steel rails were laid on the track with a 5-mm gaps between the rails during the night when the temperature of the steel was 20°C. Determine the normal stress in the steel rails when the temperature of the steel is 40°C. E = 200 GPa and a = 11.7 x 10-6 m/(m °C)

  • 3. Steel railroad rails 18,2880 m long are laid on a winter day when the temperature...

    3. Steel railroad rails 18,2880 m long are laid on a winter day when the temperature is -6,00 °C. How much space must be left between rails if they are just to touch on a summer day when the temperature is 43 °C? (4)

  • The steel rails of a railroad track (Es = 200 GPa, αs = 11.7 × 10–6/°C)...

    The steel rails of a railroad track (Es = 200 GPa, αs = 11.7 × 10–6/°C) were laid at a temperature of 6°C. Determine the normal stress in the rails when the temperature reaches 48°C, assuming that the rails (a) are welded to form a continuous track, (b) are 10 m long with 3-mm gaps between them.

  • Heat and thermodynamics. Please help with all parts for question 4. Problem4: Railroad tracks are made...

    Heat and thermodynamics. Please help with all parts for question 4. Problem4: Railroad tracks are made f om segmentsL=81mlogat7-20°C. whenthe acks are laid, the eng er of width / between adjacent segments to allow for thermal expansion. The coefficient of linear expansion is a - 12x 1 engineers design the tracks to withstand temperatures of Te-39.5 degrees. s leave gaps 0% ec and Part (o) Enter an expression, in terms of given variables, for the minimum gap distance / the...

  • AL (20) If the gap between railroad tracks closes tight, the tracks will buckle (see images)!...

    AL (20) If the gap between railroad tracks closes tight, the tracks will buckle (see images)! 20 meter stretches of Iron (Steel) railroad track are laid with a 1-inch (2.54 cm = 0.0254m) gap between them at-30-deg. C. The first hot day afterwards, the rails sat in the hot sun and their temperature rose to 355K A) (10) The gap change between the tracks = B) Based on your answer above, will the tracks buckle OR NOT ?? YES/ NO...

  • A segment of steel railroad track has a length of 30.000 m when the temperature is...

    A segment of steel railroad track has a length of 30.000 m when the temperature is 0.0°C. (a) What is its length when the temperature is 40.0°C? SOLUTION Conceptualize Because the rail is relatively long, we expect to obtain a measurable increase in length for a 40°C temperature increase. problem Categorize We will evaluate a length increase using the discussion of this section, so this part of the example is an analysis Use AL aLAT and the value of the...

  • C1) If a standard 1850 USA railroad track (11.9m) was made on a hot summer day...

    C1) If a standard 1850 USA railroad track (11.9m) was made on a hot summer day 32 °C, how long would it be on a cold night in NY -5 °C? C2) In a NY city skyscraper, there is a steel cable that is 380 m tall. If it was placed there at room temperature 20°C, and the building cooled off to 10°C in winter, how many cm would the 1st floor level be off when the elevator doors opened?...

  • Steel train rails are laid in 14.0-m-long segments placed end to end. The rails are laid...

    Steel train rails are laid in 14.0-m-long segments placed end to end. The rails are laid on a winter day when their temperature is -5.0 ∘C. How much space must be left between adjacent rails if they are just to touch on a summer day when their temperature is 33.0 ∘C? If the rails are originally laid in contact, what is the stress in them on a summer day when their temperature is 33.0 ∘C? Please answer both questions

  • A bridge with a steel framework is 500.000 m long on a winter day when the...

    A bridge with a steel framework is 500.000 m long on a winter day when the temperature of the steel is 5.0 'C. The coefficient of linear thermal expansion of steel is 11.0x107C. The bridge is built in with the two ends anchored in rock and it has a hinge at its center in case it expands past its original 500.000 m length. y = ? 250.000 m (a) How long is one half of the bridge at a temperature...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT