BM for Groups:
G1=10m
Width of the road (For drawing cross section) = 3.5m
Table 3 ( Center Line Data Sheet and Calculations):
Point |
Station |
Distance from 0 (m) |
BS (m) |
IS (m) |
FS (m) |
HPC (m) |
RL (Elevation) (m) |
BM |
- |
- |
0.501 |
||||
1 |
St 0+0 |
0 |
1.342 |
||||
2 |
St 0+10 |
10 |
1.595 |
||||
3 |
St 0+20 |
20 |
1.406 |
||||
4 |
St 0+30 |
30 |
1.381 |
||||
5 |
St 0+40 |
40 |
1.383 |
||||
TP1 |
St 0+50 |
50 |
1.36 |
1.374 |
|||
7 |
St 0+60 |
60 |
1.352 |
||||
8 |
St 0+70 |
70 |
1.352 |
||||
9 |
St 0+80 |
80 |
1.252 |
||||
10 |
St 0+90 |
90 |
1.265 |
||||
11 |
St 0+100 |
100 |
1.18 |
Note: every group will perform two set-ups (one at the beginning and one midway).