Given the following assumptions, develop a cost estimate (Labor
only) that integrates all of the cost elements into a final bid
price to the customer. What is the total cost for the project? How
long will the project take to complete?
Function points in the project: 260
Software engineers assigned to this team: 4
Function point productivity per software engineer: 5 per
month
Workdays per typical month: 22
Productive hours per typical workday: 8
Gross hourly wage rate per software engineer (does not include
fringe benefits): $50 per hour
Overhead (fringe benefit, other direct overhead) rate 42%
G&A rate: 11.5%
Proposed Profit: 15%
Q. How long will the project take to complete?
Solution:-
Function points in the project = 260
Points per month per software engineer = 5
number of software engineers = 4
So we can say that the total points in a month will be 5*4=20
Time taken in completion of the project (In months) = total function points of the project / total point per month
= 260/20=13 month
Q. What is the total cost for the project?
Particulars | Quantity / Amount ($) |
Hours / day | 8 |
Workdays / Month | 22 |
Wage rate / software engineer | $ 50 |
Total Hours in a month | 176 |
Total wage / month / engineer | $ 8800 |
Total engineers | 4 |
Total monthly wages | $ 35200 |
total months work will be done | 13 |
total wages in 13 month | $ 457600 |
overhead rate of the total wages | 42% |
overhead cost | $ 192192 |
G&A rate of the total wages | 11.50% |
G&A Cost | $ 52624 |
Total cost of the porject | $ 702416 |
Solution
The final bid price to the customer can be given including the profit in the total cost
Total cost of the project = $702416
Proposed profit = 15% = 15/100*702416 = $105362
Total Proposed bid to the customer = Total cost + proposed profit
= $ 702416 + $ 105362 = $ 807778
Given the following assumptions, develop a cost estimate (Labor only) that integrates all of the cost...
Given the following assumptions, develop a cost estimate (Labor only) that integrates all of the cost elements into a final bid price to the customer. What is the total cost for the project? How long will the project take to complete? Function points in the project: 232 Software engineers assigned to this team: 5 Function point productivity per software engineer: 5 per month Workdays per typical month: 22 Productive hours per typical workday: 8 Gross hourly wage rate per software...
Metlock Services, Inc. is trying to establish the standard labor cost of a typical brake repair. The following data have been collected from time and motion studies conducted over the past month. Actual time spent on the brake repairs 3 hours Hourly wage rate $13 Payroll taxes 10% of wage rate Setup and downtime 12% of actual labor time Cleanup and rest periods 28% of actual labor time Fringe benefits 20% of wage rate Determine the standard direct labor hours...
Monte Services, Inc. is trying to establish the standard labor cost of a typical brake repair. The following data have been collected from time and motion studies conducted over the past month. Actual time spent on the brake repair Hourly wage rate Payroll taxes Setup and downtime Cleanup and rest periods Fringe benefits 3.0 hour $14 19% of wage rate 10% of actual labor time 31% of actual labor time 26% of wage rate (a) x] Your answer is incorrect....
Exercise 11-4 (Video) Monte Services, Inc. is trying to establish the standard labor cost of a typical brake repair. The following data have been collected from time and motion studies conducted over the past month. Actual time spent on the brake repairs 1 hour Hourly wage rate $15 Payroll taxes 10% of wage rate Setup and downtime 5% of actual labor time Cleanup and rest periods 25% of actual labor time Fringe benefits 20% of wage rate Determine the standard...
Current Attempt in Progress Monte Services, Inc. is trying to establish the standard labor cost of a typical brake repair. The following data have been collected from time and motion studies conducted over the past month Actualtime spent on the brake repairs 5 hours Hourly wage rate Payroll taxes 10% of wage rate Setup and downtime 11% of actual labor time Cleanup and rest periods 27% of actual labor time Fringe benefits 25% of wage rate Determine the standard direct...
Exercise 11-4 (Video) Monte Services, Inc. is trying to establish the standard labor cost of a typical brake repair. The following data have been collected from time and motion studies conducted over the past month. Actual time spent on the brake repairs Hourly wage rate Payroll taxes Setup and downtime Cleanup and rest periods Fringe benefits 1 hour $15 10% of wage rate 5% of actual labor time 25% of actual labor time 20% of wage rate Determine the standard...
Exercise 11-4 (Video) Monte Services, Inc. is trying to establish the standard labor cost of a typical brake repair. The following data have been collected from time and motion studies conducted over the past month Shours $10 Actualtime spent on the brake repairs Hourly wage rate Payroll taxes Setup and downtime Cleanup and rest periods Fringe benefits 10% of wage rate 11% of actual labor time 27% of actual labdtime 25% of wage rate Determine the standard direct labor hours...
Earth and Artistry, Inc. provides commercial landscaping services. Sasha Cairns, the firm’s owner, wants to develop cost estimates that she can use to prepare bids on jobs. After analyzing the firm’s costs, Cairns has developed the following preliminary cost estimates for each 1,000 square feet of landscaping. Direct material $ 440 Direct labor (5 direct-labor hours at $10 per hour) 50 Overhead (at $16 per direct-labor hour) 80 Total cost per 1,000 square feet $ 570 Cairns is quite...
Cost benefit analysis for the Long Engineering Company The Long Engineering Company (LEC) has decided to install a network system to help their technical support engineers (five of them who earn an average of $100,000 each per year) to deliver better customer service including: mail out sales and other literature, answer phone calls for technical assistance and log and forward repair requests using an alpha-numeric paging system that will be part of the new network system. Currently all company...
Earth and Artistry, Inc. provides commercial landscaping services. Sasha Cairns, the firm’s owner, wants to develop cost estimates that she can use to prepare bids on jobs. After analyzing the firm’s costs, Cairns has developed the following preliminary cost estimates for each 1,000 square feet of landscaping. Direct material $ 440 Direct labor (5 direct-labor hours at $10 per hour) 50 Overhead (at $16 per direct-labor hour) 80 Total cost per 1,000 square feet $ 570 Cairns is quite...