a. Range of possible cash flow is calculated using difference between minimum and maximum value of project cash flow .
Here minimum cash flow = $1000 and maximum cash flow = $ 3000 . Thus Range = $ 3000 -$1000 = $2000
b. Expected cash flow =
= $1000* 20% + $2000 * 60% + $3000 * 20% =
$ 2000
c. Standard Deviation =
=
= 632.455
Where = expected project
cash flow x= project cash flow P(x) = probability of respective
project cash flow
d. Coefficient of variation = standard
deviation / mean
(
) = 632.455 / 2000
= 0.3162
Consider the probability distribution of the first year cash flows for the DEF Project: Project Cash...
Project A Project B Probability Cash Flows Probability Cash Flows $6,250 0.6 0.6 $6,500 $6,750 $6,500 $17,000 BPC has decided to evaluate the riskier project at 13% and the less-risky project at 10%. The data has been collected in the Microsoft Excel Online file below. Open the spreadsheet and perform the required analysis to answer the questions below. Open spreadsheet a. What is each project's expected annual cash flow? Round your answers to two decimal places. Project A: $ 6500...
Consider the following probability distribution of returns estimated for a proposed project that involves a new ultrasound machine: State of the Probability Rate of economy of occurrence return Very poor 0.1 -10% Poor 0.2 0% Average 0.4 10% Good 0.2 20% Very good 0.1 30% a. What is the expected rate of return on the project? b. What is the project's standard deviation of returns? c. What is the project's coefficient of variation (CV) of returns? d. What type of...
everything is the same except that probability of low response
is 0.1, moderate response is 0.3, high response is 0.4 and very
high response is 0.2
show your work.
A project has an initial cost of $2,800 and the Wellsley Corporation's cost of 14-2 capital is 10 percent. The project has the following probability distribution of expected net cash flows in each of the next three years: Possible Market Reaction Probability Net Cash Flow $1,000 Low response 0.20 Moderate response...
10.1 Consider the following probability distribution of returns estimated for a proposed project that involves a new ultrasound machine: State of the Economy Very poor Poor Average Good Very good Probability of Occurrence 0.10 0.20 Rate of Return -10.0% 0.0 0.40 10.0 0.20 20.0 0.10 30.0 a. What is the expected rate of return on the project? b. What is the project's standard deviation of returns? What is the project's co- efficient of variation (CV) of returns? (Hint: CV is...
The San Diego LLC is considering a three-year project, Project A, involving an initial investment of $80 million and the following cash inflows and probabilities: Year o Year 1 Year 2 Year 3 Probability Cash Flow Probability Cash Flow Probe o ($ mil.) (Smil) Probability Cash Flow 0.2 60 0.3 70 50 0.4 4 60 0.1 0.2 Initial Investment $80 mil. Discount Rate 8% Describe your answer for each question in complete sentences, whenever it is necessary. Show all of...
The San Diego LLC is considering a three-year project, Project A, involving an initial investment of $80 million and the following cash inflows and probabilities: Year o Year 1 Year 2 Year 3 Probability Cash Flow Probability Cash Flow Probe o ($ mil.) (Smil) Probability Cash Flow 0.2 60 0.3 70 50 0.4 4 60 0.1 0.2 Initial Investment $80 mil. Discount Rate 8% Describe your answer for each question in complete sentences, whenever it is necessary. Show all of...
What is the net present value (NPV) of a project that has the following cash flows? The required return is 10.0% Year 0 1 2 Cash Flow $ (5,000) $2,000 $ 2,000 $ 2,000 $3,000 $1,000 $1,000 3 4 5 6
Problem 2 . Consider the cash flow . Project Cash Flows series given for an investment project. Determine the project balances over the life of the project at an interest rate of 12%. End of Year Cash Flow $3,000 -$1,500 $4,000 $3,000 $5,000 0 4
A new project has expected annual net cash flows of $160,000 with a standard deviation of $480,000. The distribution of annual net cash flows is approximately normal. Use Table V to answer the questions. Round your answers to two decimal places. What is the probability of the project having negative annual net cash flows? % What is the probability that annual net cash flows will be greater than $310,000? %
Calculate the payback period for a project that has the following cash flows? The required return is 12.0%. Year Cash Flow 0 $ (12,000) 1 $ 1,000 2 $ 2,000 3 $ 3,000 4 $ 4,000 5 $ 5,000 6 $ 6,000 2.25 years 3.25 years 3.85 years 4.40 years None of these are correct.